1)renewal scheme更新方案
1.The static model,dynamic model,and five comparison methods of the cost present worth of equipment renewal scheme were also introduced with examples.系统地介绍了设备经济寿命的定义,确定设备经济寿命的静态模型和动态模型及五种设备更新方案的费用现值比较方法,并举例说明各种方法的具体应用。
英文短句/例句
1.A New Rekeying Scheme for Multicast Based on LKH Tree一种新的基于LKH的组播密钥更新方案
2.U-Disk Software Updating Solution Based on IAP Function基于IAP功能的USB方式软件更新方案
3.An XUpdate2SQL Update Scheme Based on Relational Database一种基于关系数据库的XUpdate2SQL更新方案
4.Adaptive Huffman tree scheme for multicast rekeying自适应Huffman树组密钥更新方案
5.Private key updating scheme of identity-based public key cryptography under distributed network分布式网络中基于IDPKC的私钥更新方案
6.IEEE 802.11i GTK update scheme based on improved Logical Key Hierarchy基于逻辑密钥树的IEEE802.11i GTK更新方案
7.Improved pairwise key-updating scheme for wireless sensor network无线传感器网络中一种改进的对密钥更新方案
8.Comparison and Selection for Equipment Renewal Plan in Production Management of Enterprise;设备更新方案的比较与选择在企业生产管理中的应用
9.Weight Synchronization Neural Network-based Key Update Scheme for TinySec Protocol一种基于神经网络权值同步的TinySec协议密钥更新方案
10.Proactive secure multi-secret sharing scheme with double renewing双重更新动态安全的多秘密共享方案
11.Application of Time Value of Capital in Decision - making Scheme of Equipment Renewal;资金的时间价值在设备更新决策方案中的运用
12.Discuss the Importance of Renewal of Method in Studying the Stone & Brick Form of Han Dynasty by Analysing the Typical Case;从典型个案看方法更新在汉画研究中的重要性
13.The Plan for Capital Rasing Renewing Coaches on the Chengdu-Chongqing Freeway;成渝高速客运车辆更新的资金解决方案
14.The Renewal-Process and Mtpfg Approach to Chain Sampling Plan;更新过程及流向图在链型抽样方案中的应用
15.Research on Updating Code Schema and Index Techniques for XML Data支持XML数据更新的编码方案与索引技术研究
16.Study on Method of Statements for Rehabilitation & Upgrading Project in Sabah Railway Malaysia马来西亚沙巴铁路更新改造工程施工方案研究
17.Research and Realization of configuration updating on_line Based on FPGA一种基于FPGA的在线更新配置方案的研究与实现
18.The Design of Database Updating and Construction for Provincial 1∶10000 Topographic Map省级1∶10000地形图数据更新与入库方案设计
相关短句/例句
replacement scheme设备更新方案
3)Dynamic Location Update动态位置更新方案
4)change scheme更改方案
5)changed programs变更方案
1.Changed programs factors are not the same,Choose the optimized program should focus on the changed programs\' technical and economic comprehensive factors and try to select programs with new technology,low risk and lower investment.变更方案的选择直接影响单位工程施工的经济效益和工程质量等一系列指标,变更方案的选择考虑的因素也不尽相同,选择最优方案应着重于各变更方案的技术经济比较,综合考虑各类影响因素,力求选取技术新、风险小、投资增加少的方案。
6)replacing scheme更换方案
1.Through comparison and analysis of the advantages and disadvantages of the GMH-3 bus protection and the BP-2B digital protection, the paper presents a reasonable replacing scheme, explains the course of implementation, and emphasizes some points worthy of noting.通过分析比较GMH-3和BP-2B两种不同类型的母差保护的优缺点,提出了合理的母差保护更换方案,并对具体实施过程进行了说明,强调了保护更换过程中应该注意的问题,对进行类似的工作具有参考作用。
延伸阅读
《森林采伐更新管理办法》《森林采伐更新管理办法》management rule on forest tree cutting and regeneration 同的更新方式规定了必须达到的质量标准和对采伐更新实行的检查监督制度。⑥对违反采伐更新管理规定的,分别作出了处罚的规定。(王洪杰)senlin eaifa gengxin guanli banfa《森林采伐更新管理办法》(mallage-meni nile on forestt找兄cutting andre-gene皿ion)根据《中华人民共和国森林法》的有关规定制定的专门规范森林采伐和更新管理的行政法规。国务院1987年8月25日批准,林业部1987年9月10日发布施行。其目的是为了保证合理采伐森林,及时更新采伐迹地,恢复和扩大森林资源。该办法共5章27条。主要内容是:①森林采伐更新贯彻“以营林为基础,普遍护林,大力造林,采育结合,永续利用”的林业建设方针,执行森林经营方案,实行限额采伐,发挥森林的生态效益、经济效益和社会效益。②规定了森林采伐的4种方式,即主伐、抚育采伐、更新采伐和低产林改造。用材林的主伐又分为择伐、皆伐和渐伐。③明确规定了用材林主要树种的主伐年龄和各种采伐方式的适用范围。严格控制皆伐,皆伐面积一次不得超过5公顷,特殊情况下最大面积不得超过20公顷。④规定了森林更新的原则,即在采伐后的当年或者次年内必须完成更新造林任务。优先发展人工更新,实行人工更新、人工促进天然更新和天然更新相结合的原则,保证采伐迹地的更新。⑤分别不
