紫坪铺,Zipingpu
1)Zipingpu紫坪铺
1.Zipingpu water conservancy project is the main water regulation project in Dujiangyan irrigation area.紫坪铺水利枢纽是都江堰灌区的主要水源调节工程,其主要功能是通过水库的调丰补枯和水库的滞洪作用,提高灌区的农业灌溉、城镇工业、生活及生态环境供水的保证率和下游岷江干流的防洪能力。
2.Zipingpu, the high concrete face rock-fill dam, experienced the catastrophic earthquake which caused collapse and horizontal deformation of dam, damage and dislocation of seepage prevention plates.紫坪铺高混凝土面板堆石坝在"5·12"汶川地震中,经受了超抗震设计标准的考验,强震导致大坝出现较大震陷和水平变形,防渗面板发生挤压破坏、脱空与错台、水平接缝错位等震损震害。
3.Based on the study ofstructure plane in underground cavities of Zipingpu water resources and hydroelectric project, Morphologicalproperty, stability and sensitive affected factors of the accidental.本文重点通过对紫坪铺水利工程右岸地下洞室开挖中揭露的结构面发育状况研究,计算并分析了地下洞室中块体的分布特征和稳定性,这对工程区地下洞室围岩的整体及局部稳定性分析研究具有重要意义。
英文短句/例句

1.A Study on the Prevention Techniques to Gas of the Diversion Tunnel in Zipingpu Hydro Project;紫坪铺工程导流洞瓦斯防治技术研究
2.Damage of guardrails on crest of Zipingpu CFRD in Wenchuan earthquake and its enlightenment紫坪铺大坝坝顶护栏震损情况及启示
3.Seismic Damages of Dam of Zipingpu Reservoir and Emergency Repairs紫坪铺水库大坝震损及应急修复综述
4.Water conservancy hubs of Sichuan Zipingpu and Ningxia Shapotou of the Yellow river.1.四川紫坪铺和宁夏黄河沙坡头水利枢纽
5.ANALYSIS ON BLASTING VIBRATION EFFECT ON PRSTRESSED CABLE OF HIGH SLOPE IN ZIPINGPU PROJECT紫坪铺进水口高陡边坡锚索抗爆破振动分析
6.Earthquake damage analysis of Zipingpu concrete face rock-fill dam during Wenchuan earthquake汶川地震中紫坪铺混凝土面板堆石坝震害分析
7.A Primary Analysis of Seismic Behavior and Damage for Zipingpu CFRD during Wenchuan Earthquake汶川地震中紫坪铺面板坝抗震特性初步分析
8.Improvement of Pressure Relief Valve for Technical Water Supply System in Zipingpu Hydropower Plant浅议紫坪铺电厂技术供水系统减压阀的改造
9.Testing and analysis on blasting vibration of small spacing zone in Zhipingpu tunnel紫坪铺隧道小净距段爆破振动现场测试及分析
10.Study on Model Test for Estimating Scouring in Bedrock during Ski-jump Energy Dissipation at End of 1# Spillway Tunnel of Zipingpu Project紫坪铺1号泄洪排沙隧洞挑流基岩冲刷模型试验研究
11.Study of Uplifting Mechanism for Toe Slab Grouting in Zipingpu Hydroelectric Project;紫坪铺水利枢纽工程大坝趾板灌浆抬动机理研究
12.Research of Stress-Strain Characteristics of Zipingpu Reservoir Concrete Faced Rockfill Dam s Material and Finite Element Analysis of the Dam;紫坪铺面板坝筑坝料应力—应变特性研究和坝体计算分析
13.3-D FEM Analysis of Diversion Tunnel Plug and Surrounding Rock s Stability of Zipingpu Hydro Project;紫坪铺水利枢纽导流洞堵头及围岩稳定性三维有限元计算分析
14.The Function of ZIPINGPU Hydraulic Complex Engineering in western Development;试论紫坪铺水利枢纽工程在西部大开发中的作用
15.Research on Seismicity and Source Parameters of Small Earthquakes in the Zipingpu Dam Before Wenchuan M_S8.0 Earthquake汶川8.0级地震前紫坪铺水库小震活动及震源参数研究
16.STUDY OF ATTENUATION CHARACTERISTICS,SITE RESPONSE AND SEISMIC SOURCE PARAMETERS OF THE ZIPINGPU RESERVOIR REGION紫坪铺水库库区介质衰减、台站响应和震源参数研究
17.MONITORING ANALYSIS OF INFLUENCE OF WENCHUAN 8.0 EARTHQUAKE ON TALUS SLOPE STABILITY AT LEFT BANK IN FRONT DAM OF ZIPINGPU HYDRAULIC PROJECT汶川8.0级地震对紫坪铺左岸坝前堆积体稳定性影响的监测分析
18.Analysis of Earthquake Damage of the Zipingpu Dam in Wenchuan Earthquake and the Study Proposal on the Anti-earthquake and Disaster Reduction of High Earth-rock Dam紫坪铺大坝汶川地震震害分析及高土石坝抗震减灾研究设想
相关短句/例句

Zipingpu Project紫坪铺
1.Monitoring for Concrete Faced Rockfill Dam Settlement during Construction of Zipingpu Project;紫坪铺混凝土面板堆石坝施工期沉降监测分析
2.Solutions for some key technical problems for concrete faced rockfill dam at Zipingpu project is presented mainly.紫坪铺工程面板堆石坝于2003年3月开始填筑,2005年6月填筑完成,历时27个月,总填筑量为1 177万m3,面板分三期施工,大坝监测数据表明大坝填筑质量优良。
3)Zipingpu Project紫坪铺工程
1.Distribution of Abandoned and Old Coal Mines in the Dam Area at Zipingpu Project;紫坪铺工程坝区废旧煤洞的分布特征
2.Due to complex and varied geological conditions for 4 headrace tunnels at Zipingpu Project , real time monitoring technique was used during informatization construction according to new Austrian tunneling method , system observation for typical sections was conducted by following in situ construction , based on which inverse analysis for rock mechanics parame.针对紫坪铺工程 4条引水发电隧洞复杂多变的地质条件 ,采用新奥法隧洞信息化施工中倡导的实时动态监测技术 ,跟踪现场施工进行了典型断面的系统观测 ,在此基础上进行了围岩宏观力学参数的反分析研究。
4)Zipingpu reservoir紫坪铺水库
1.Application of Fractal Theory in the Stage Analysis of Flood Season in Zipingpu Reservoir;分形理论在紫坪铺水库汛期洪水分期中的应用
2.Based on digital seismograms recorded by Zipingpu reservoir digital seismic network and YZP station of Chendu Digital Tele-seismic Network from August 2004 to May 2008 before the M8.利用紫坪铺水库数字地震台网和成都区域数字台网中的油榨坪台2004年8月到2008年5月12日汶川大地震前的紫坪铺库区2级以上地震波形资料,采用Atkinson方法计算了紫坪铺水库库区地震波非弹性衰减系数、几何扩散系数和介质品质因子;利用Moya等提出的方法计算了台站场地响应;对震源谱的低频水平和拐角频率进行了联合反演,并计算了紫坪铺库区287次1。
3.The focal mechanism parameters of 262 small earthquakes recorded by Zipingpu reservoir earthquake monitoring network are calculated.用紫坪铺水库专用台网的地震记录测定紫坪铺水库区262次小震震源机制参数,结果表明:节面I的优势方向与断裂走向展布一致性很好;库区地震断层有逆断层、正断层、左旋和右旋走滑断层,走滑断层占45%;库区断层66%陡峻,35%几近直立;受水库蓄水的影响,2006年7月1日后以走滑断层活动方式明显增多,水库地震群时段走滑断层活动方式表现突出。
5)Zipingpu tunnel紫坪铺隧道
6)downstream of Zipinpu dam紫坪铺坝下游
延伸阅读

紫坪铺镇  紫坪铺镇位于世界文化遗产都江堰首部,具有悠久的历史。早在古蜀国时,设置了"紫坪邮":两千多年前,李冰创建都江堰后,修筑了通往西山少数民族地区的"冉山道"(松茂古道);礓时,诸葛亮"征丁一千二百人"主护都江堰,屯兵马超坪,又成为军事重镇,为促进民族之间的经济、文化交流发挥了积极作用。  现全镇幅员面积23.5平方公里,辖6个行政村、37个农业合作社。1个居委会,人口15758人。新中国成立特别是改革开放以来,全镇经济社会持续、健康发展,贫穷落后的山乡发生了翻天覆地的变化,迎来了紫坪铺镇大发展的今天。  紫坪铺将采取更加有力的措施,进一步实行开明、开放的优惠政策,充实、加强专门班子,为外来投资者积极主动做好全程优质高效的服务。凡来投资兴办的企业均享受国家、省、成都市和都江堰市制定的一系列优惠政策,尤其对无污染、附加值高的高科技、高耗能项目实行更加特殊的优惠政策。  紫坪铺镇特殊的地形地貌,形成了多样的自然生态环境,为发展生态农业提供了有利条件。近年来,坚持以市场为导向,农民增收为目标,不断加大农业结构调整力度,着力发展了观光农业区、无公害蔬菜种植区、退耕还林示范区、以猕猴桃、银杏、黄花、佛手瓜等为主的经济作物已初具规模,呈现出良好的发展势头。