1)reassessment[英][,ri:?'sesm?nt][美][,ri?'s?sm?nt]再评估
1.The reassessment of reliability of geological report during construction of the geological resources of gold;对金矿地质资源在建设利用时可靠程度再评估的探讨
英文短句/例句
1.Consistent set of assessment guidelines to establish uniform valuation basis for revaluation.统一的评估导则,保证再评估的统一基础。
2.The Reassessment to the Efficiency of Monopoly under the Econmic Globalization;经济全球化背景下垄断效率的再评估
3.A TECHNICAL REASSESSMENT OF THE CONCLUSIONS AND IMPLICATIONS OF THE COX COMMITTEE REPORT对《考克斯报告》结论和寓意的技术性的再评估
4.Prognostic Reevaluation of CT and Clinical Criteria for Acute PancreatitisCT及临床分级法对急性胰腺炎预后的再评估
5.Reevaluation of Blood and Ascites Fluid Endotoxin Levels in Patients with Chronic Liver Diseases(CLD);慢性肝病患者血、腹水内毒素水平的再评估
6.Size up the situation before acting.先评估情况再行动。
7.The Research of the Value Evalution of the Disuse Industrial Building;旧工业建筑再利用价值评估综合研究
8.Consolidate the Assessment Achievement; Build the College into a More Outstanding One;巩固成果,再上层楼——评估后的思考
9.Japanese Policies on Recovery and Recycling Regenerative Resources and Performance Evaluation;日本再生资源回收政策及其绩效评估
10.A remanufacturability assessing model for waste electromechanical products废旧机电产品再制造性评估模型研究
11.Retrospective analysis of presurgical evaluations for patients with intractable temporal lobe epilepsy难治性颞叶内侧癫痫术前评估方法再评价
12.The Construction of Training Evaluation Cycle Mode and the Reconstruction of China s Civil Servant Training Evaluation System;培训评估圈模式构建与我国公务员培训评估机制再造
13.More on the Methods of Enterprise Value Assessment;企业价值评估方法的再探讨——兼论新估价方法的尝试性构建
14.The Personal Credit Assessment Model and System Design of Re-employment Loan;再就业贷款个人信用评估模型及系统设计
15.Assessing and Re-designing the Conference Interpreter Training Program of Sichuan University;对四川大学会议口译培训项目的评估和再设计
16.The Study of Health Risk Assessment on Heavy Metals of Crops in City Reclaimed Water Irrigation Area;城市再生水灌区作物重金属健康风险评估研究
17.Promote the NTA and Enhance the Teaching Efficiency;做好评估工作,推动教学工作再上新台阶
18.Reappraisal of Metal Resource Life by the Material Recircul ation Index;用材料再生循环指标重新评估金属资源寿命
相关短句/例句
term reweighting词元再评估
3)risk re-assessment风险再评估
1.Along with the development of the society and the improving of the people\'s safety awareness,tunneling risk re-assessment and dynamic risk control,which are the most effective,most economic,most reliable and most safe tunneling risk control methods,are gradually recongnized and accepted.作为对隧道风险控制最有效、最经济、最稳妥、最安全的管理方法——隧道风险再评估与动态管理逐渐被人们所认同、接受,但是该方法作为一项新兴领域至今还没有得到普及。
4)re-service term评估再服役期
5)remanufacturability assessment再制造性评估
6)Overall Assessment of Remanufacturability再制造性的综合评估
延伸阅读
Delcam免费模具评估软件PowerSHAPE-eDelcam推出一款免费下载的评估软件PowerSHAPE-e,以便工具制造商和关联承包商利用CAD模型更快、更准确地提交报价。该软件适用于各种类型的工具制造——塑料、橡胶、陶瓷或玻璃材质的模具;以及用于制造金属元件的铸造设备、压制工具与模版等。它也能帮助机械承包商评估生产所需时间,无论是针对短期的原型设计过程,还是长期的生产过程。PowerSHAPE-e可从www.powershape-e.com免费下载。由于下载套装已整合了PS-Exchange数据转换软件,PowerSHAPE-e可与所有主流CAD系统兼容,包括CATIA、UG、Pro/Engineer、IDEAS、SolidWorks、AutodeskInventor和SolidEdge,以及IGES、STEP等通用型格式文件。利用PowerSHAPE-e,被导入的模型可按所需尺寸进行修改,也可利用色彩拼图(ColorMapping)工具进行分析,把拔模角度、壁厚显示出来。而且任何指定点的准确数值都能被显示出来。此外还可用弯曲工具进行分析,以确定在加工不同特徵时所需的刀具尺寸;以及用光滑度分析工具,对设计的整体质量进行评估。不仅如此,由于带有模型比较功能,在洽谈过程中加入的的任何变化都能被识别并立即重点显示。这功能之所以重要,是因为承包商如果根据元件的旧有版本报价,将可能招至损失。众所周知,对于工具制造行业来说,更快推出新产品是一个非常大的压力。以此为背景,特别是对于那些有心拓展市场的中小型企业而言,更快地作出报价并发给客户显得非常重要,因为这将有助于客户快速下订单。事实上,虽然CAD模型相比2D图形包含了更多的信息,但是要想准确评估制造工具或零部件的工作量还是相当困难的。而PowerSHAPE-e凭借对CAD模型更为精准的理解,可协助外包商实现准确而快捷的报价,规避估价过高或过低的风险,为使用者赢得市场先机。更重要的,是该软件可识别CAD模型中可能出现的问题,让用户在加工前作出修正。
