三期工程,phase Ⅲ engineering
1)phase Ⅲ engineering三期工程
1.Design feature of phase Ⅲ engineering in Dexing Copper Mine;德兴铜矿三期工程的设计特点
英文短句/例句

1.Process optimization of third stage project of the Guhengqiao Water Plant in Pinghu City平湖市古横桥水厂三期工程工艺优化
2.Study on Water Resources in the Third Project of Chen Ming Thermoelectricity Factory of Shandong;山东晨鸣热电厂三期工程水资源研究
3.The Feasible Investigation of Quzhou Unicom Third CDMA Project;衢州联通CDMA网三期工程可行性研究
4.Practice on the Third Phase Construction and Management of Three Gorges Project长江三峡水利枢纽三期工程建设管理实践
5.Quality Management for the Third Phase Construction of Three Gorges Project长江三峡水利枢纽三期工程质量管理简介
6.The third-stage of the first phase of the three-north shelterbelt project has created 22 million hectares of forests.三北工程第一阶段的三期工程累计造林2200万公顷。
7.Research and practice on new technology of concrete rapid construction in Three Gorges project三峡三期工程大坝混凝土优质快速施工新技术研究及实践
8.Research on Informatization Management of Large Construction Project--Taking Zhejiang Beilun Power Plant Phase III Project as a Case大型工程项目信息化管理研究——以北仑电厂三期工程为例
9.Research of Post-project Environmental Impact Evaluation of Haibowan Power Plant;海勃湾电厂三期工程项目环境影响后评价研究
10.Study of Economic Benefits Post Evaluation of the Third Phrase Construction Project of Haibowan Power Plant;海勃湾电厂三期工程项目经济效益后评价研究
11.The Sustainable Development Research of Haibowan Power Plant s 3th Construction Project;海勃湾电厂三期工程可持续发展后评价研究
12.Optimal Research for Subgrade Project of the Third Project of the Tongliao Power Plant;通辽发电厂三期工程地基方案优化研究
13.The Construction Technology for Sand Quilts Dike-Dam of the Miaoling Engineering(Phase 3) of the Lianyungang Port连云港庙岭三期突堤砂被堤工程施工工艺
14.Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance秦山三期(重水堆)核电站工程质量保证
15.A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project秦山三期(重水堆)核电站工程进展概况
16.Statistical analysis of the phase Ⅳ project of Three-North Shelterbelt in Hebei Province;河北省三北防护林四期工程统计分析
17.Three Represent s--Cardinal Guiding Principle for CPC s Building in Modern Times;“三个代表”——新时期党建工程的根本指针
18.The Three Gorges Project is a large-scale project with long construction period and large investment demand.三峡工程规模巨大,建设工期长,投资需求大。
相关短句/例句

second and three stages projects二期三期工程
3)Ⅲ-Phase Works of TGP三峡三期工程
1.Curtain Grouting Construction & Technology Management of Ⅲ-Phase Works of TGP;三峡三期工程帷幕灌浆施工与工艺管理
4)Cuixi Smelter phase-III project贵冶三期工程
5)third phase project in Baosteel宝钢三期工程
1.General introduction to the EIC system of the third phase project in Baosteel(A);宝钢三期工程三电系统概述(上)
6)Three Gorges Project Ⅱ stage construction三峡二期工程
1.The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。
延伸阅读

欧洲式期权、美国式期权与亚洲式期权欧洲式期权、美国式期权与亚洲式期权  【欧洲式期权、美国式期权与亚洲式期权】期权合约所规定的权利有一定的时效期,过了失效日后,权利即行作废。一些期权规定权利仅能在有效期的最后一天执行,这种期权被称为欧洲式期权(ell功pean叩tions);另一些期权则容许在有效期内任何一天执行,这种期权被称为美国式期权(一~oPtions)。值得指出的是,虽名为欧洲式或美国式期权,但已无任何地理上的意义。由于欧洲式期权的规定过于严格,又出现了一种“改变的欧洲式期权”,它允许期权在一定的时间范围内进行交易。可见,美国式期权为期权购买者提供了更多的选择机会,因此,它的购买者也往往需支付更高的保险费。近年来无论在欧洲或美国,所交易的期权均以美国式为主,欧洲式期权虽仍存在,但其交易量已比不上美国式期权。 在so年代末期,市场上又出现了一种所谓亚洲式期权(asian ontions),但也无地理上的意义,其差别主要在于履约价值(exe而sev公此)的计算。以买权为例,无论是美国式期权或是欧洲式期权,执行权利所能得到的履约价值均为当时标的物的市价减去履约价格,再乘以合约所定的数量,但亚洲式期权的履约价值则为权利期间内标的物市价的平均(计算至履约日为止),减去履约价格,再乘以合约所定的数量。