1)diversion line引水线路
2)water conveyance line in the north trunk of Yellow River Diversion Project引黄北干输水线路
1.The collapsibility of loess foundation is the main project geology problem of water conveyance line in the north trunk of Yellow River Diversion Project.黄土地基的湿陷性是引黄北干输水线路的主要工程地质问题。
英文短句/例句
1.Research on the Loess Collapsibility Project Geology of Water Conveyance Line in the North Trunk of Yellow River Diversion Project引黄北干输水线路黄土湿陷性工程地质研究
2.Water Quality Modeling and Control Study of Sang Gan River in the North Line of the Yellow River Diversion Project引黄北干线输水工程桑干河道水质模拟与控制研究
3.On Planning of Regulation Reservoirs in North Main Line of YRDP万家寨引黄北干线调节水库规划问题
4.Evaluation of Reservoir Seepage for the Daliang Yellow River Diversion Project;引黄入晋工程北干线大梁水库渗漏问题研究
5.Water Price Design of the North Arterial Project of Yellow River Diversion in Wanjiazai;对万家寨引黄北干线工程水价设计的思考
6.Discussion on the Influences of the Construction of No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP on the Wells in Some Villages along the Line万家寨引黄工程北干线1号隧洞施工对沿线部分村庄水井的影响
7.Scheme Comparison of Transfer and Storage Reservoir in the North Trunk of Diversion Yellow River Water into Shanxi Project in Wanjia Village Shanxi Province山西省万家寨引黄入晋工程北干线调蓄水库方案比选
8.Discussion on Accident Causing Shutdown of TBM in Excavation of Tunnel of Northern Main Line引黄北干线某隧洞TBM卡机事故探讨
9.Study on the Capacity of Water Transfer about the Channel of Hebei Province in the Drawing Water Project from Yellow River to Tianjin City China;引黄济津应急调水工程河北段输水能力研究
10.The Optimization to Diversion Tunnel Route in Hebei Section of Mid-Rout in the South-to-North Water Transfer Project南水北调中线工程河北段引水隧洞线路优化
11.Effects Analysis of Diverting Water and Sand of Warping Tests in Xiaobeiganliu of the Yellow River;黄河小北干流放淤试验引水引沙效果分析
12.Analysis on Constructing PCCP Factory in North Main Line Project of Wanjiazhai YRDP;万家寨引黄工程北干线PCCP管厂的建设分析
13.Environmental Protection Design of Wanjiazhai Yellow River Diversion Project(North Main)万家寨引黄入晋工程北干线环境保护设计
14.Optimized Design of the Yellow River to Tianjin Inner City Water Diversion Pipeline Project;引黄济津市内输水管线工程的优化设计
15.The Water Price Analysis of Water Supply from The South Main Line of YRDP to Jinzhong Plain Region;万家寨引黄南干线向晋中平川区供水水价分析
16.The Application of Geosynthetics in the Storage Reservoir of Yellow River Diversion Project土工合成材料在引黄北干调节水库中的应用
17.Analysis on the Seepage Deformation of the Dam Foundation of Shangxizhuang Reservoir in North Trunk of YRDP(Yellow River Diversion Project)引黄北干尚希庄水库坝基渗透变形分析
18.Study on the Alternative Route of the Yellow River-crossing Project南水北调中线穿黄工程线路比选方案试验研究
相关短句/例句
water conveyance line in the north trunk of Yellow River Diversion Project引黄北干输水线路
1.The collapsibility of loess foundation is the main project geology problem of water conveyance line in the north trunk of Yellow River Diversion Project.黄土地基的湿陷性是引黄北干输水线路的主要工程地质问题。
3)The optimization and comparative selection of water diversion line引水线路的优化比选
4)bay-line引进线路
5)via pin通路引线
6)Leading water引路水
延伸阅读
坝-引水混合式水电站 采用坝和有压引水道共同集中水头,或主要用坝取得水头,并依靠引水道引水以开发水能的水电站。坝集中一部分落差外,再通过有压引水道(隧洞、管道等)集中坝下游河段的另一部分落差,形成电站的总水头。这种开发方式具有坝式水电站和引水式水电站的共同优点,当河段上游坡降较缓且有筑坝建库条件,而下游河段坡降很大(如有急滩、跌水或大河弯)的情况下,特别适用于这种布置形式。 坝-引水混合式水电站的特点是:①坝与厂房分开,二者用较长的压力水道(隧洞、钢管等)连接;②上游有水库,能进行径流调节,提高枯水季的发电引用流量;③电站的水头由坝抬高上游水位和引水道集中沿程落差而得,水头较大,但坝的高度和水库淹没损失均较小;④在引水道末端与进厂前的高压水管间,一般设有调压室等调压设施,如采用地下式厂房,且尾水隧洞较长时,还可能要设置尾水调压室(图a)。 坝-引水混合式水电站与引水式水电站和某些坝后式水电站有时难以明确划分,一般应以坝和引水道所获得的水头均能达到电站设计水头的较大比重时,方能称为坝-引水混合式水电站。当采用土石坝或虽采用混凝土坝而在坝下游直接布置厂房有困难时,也可在距坝较近的距离,利用通过或绕过坝体的引水管道将水引入厂房。这时,水电站厂房等建筑物与坝分开,自成系统(图b、c)。有时虽然将这种布置方式也称为坝-引水混合式水电站,但是其坝和厂房集中在很短的一个河段中,电站的水头基本上全部由坝壅高水位获得,实质上仍是坝式水电站。 中国建造了较多的坝-引水混合式水电站,如狮子滩、流溪河、古田溪一级等水电站,坝与引水道所得水头各占水电站设计水头的二分之一左右。湖南镇、云峰等水电站的水头主要由坝获得,引水道得到的水头所占比重甚小,类似坝式水电站。而鲁布革、下马岭、铁门关等水电站的水头主要由引水道得到,由坝所得到的水头仅及电站设计水头的四分之一左右,又近似引水式水电站。
