风险系统,risk system
1)risk system风险系统
1.From the aspects of systematology and tourist geology, tourist security is taken as a risk system, which is a special complicated and correlated system consisting of the tourists and the enviro.笔者从系统论和旅游地理学的角度,把旅游安全作为一个风险系统进行研究;认为旅游安全风险系统是由旅游者与旅游景区环境共同组成的一个复杂的特定的相互依赖的系统;初步探讨旅游安全风险系统的组成、结构和研究内容;对旅游安全风险系统的安全分析、安全评价和安全措施进行了相关研究;通过研究,以期弄清现代旅游业发展中存在的安全问题,提出旅游安全风险对策。
2.In this paper the concept of risk system in the process of the economic evaluation of oil and gas exploration is presented and the functions of its sub-systems are analyzed in order to reduce risk and increase economic benefit of the oil and gas exploration.该文提出了油气勘探经济评价过程风险系统概念 ,并对其子系统的作用进行了剖析 ,以期有助于降低油气勘探风险 ,提高勘探经济效
3.On the basis of analyzing the social, the economy, the politic-legal, the human resource(SEPH) risks and their interconnected relations, a concept model of HTP risk system is extablished which can be defined "SEPH" risk complex system and its interpretive structural modeling(ISM) is also put forward by applying the method of system engineering and ISM.在分析高新技术项目(HTP)面临的经济风险、社会风险、政策法规风险和人力资源风险等区域风险及多重关联影响的基础上,建立了HTP风险系统的概念模型,应用改进的解释结构建模方法(ISM)对其建立了结构模型。
英文短句/例句

1.Optimization Management of Regional Environmental Risk Based on Risk System基于风险系统理论的区域环境风险优化管理
2.Systemic risk \ Moral risk and Deposit Insurance System;系统性风险、道德风险与存款保险制度
3.A fuzzy Method for Evaluating the Non-systematic Risks of Venture capital investments;风险投资非系统风险的模糊评价方法
4.Research Sports Insurance Company Risk Manage System in China;我国体育保险公司风险管理系统分析
5.On the Probabilities of Deposit Insurance System Lowering Bank System Risks;存款保险制度能否降低银行系统风险
6.Systematic Hazard Identification and Risk Assessment on Beiminghe Iron Ore Mine北洺河铁矿系统危险辨识与风险评价
7.Industrial Risk,Systematic Financial Risk,Country Risk and Risk Management:The Case Study of Daqing City;产业风险、金融系统性风险与国家风险及其管理:大庆个案分析
8.Risk Management for Economic Systems Based on Risk Energy Analysis;基于风险能量分析的经济系统风险管理研究
9.Risk Analysis Method and Information Systems of Risk Evaluation for Arch Dam;拱坝风险分析方法及风险评价信息系统
10.University financial risk and risk early warning system;普通高校财务风险及风险预警系统的建立
11.On Building the Pre-Warning and Pre-Controlling System of Venture For Pioneering Enterprise;如何建立风险投资项目的风险预警预控系统
12.Analysis and Evaluation for the Non-Systematic Risks of Venture Capital Inverstments;风险投资项目非系统风险的分析与评价
13.Financial Risks and the Warning System at the New Century;新时期金融风险及金融风险预警系统研究
14.An Research on the Measurement of the Banking Systematic Risk Based on the Risk of Infection基于风险传染角度下银行系统性风险测度研究
15.Scaling Method of Personnel Credit Risk Assessment System;个人信用风险评价系统的统计量表法
16.The Relationship between Enterprise R&D Investment, Income and Systematic Risk;企业研发投资与收益、系统风险的关系
17.Research on Risk Quantification Model of Information System Security and Realization of Risk Evaluation System;信息系统安全风险量化模型研究及风险评估系统的实现
18.System Risk & Non-System Risk of Portfolio--Comment Concurrently on a Decentralized Study on Portfolio Risks by Wang Hui et al.;组合投资的系统风险与非系统风险——兼评王辉等人的《投资组合风险的分散化研究》
相关短句/例句

systematic risk系统风险
1.Measurement of the systematic risk of equity capital of listed steel companies in China;我国钢铁上市公司股权资本系统风险的测量
2.Systematic Risk and Its Transmission Effect;系统风险及其传递效应——来自上海和香港股票市场的经验证据
3.Empirical research of systematic risk:Evidence from Shanghai s stock market;沪市系统风险β系数实证研究
3)system risk系统风险
1.Inquiry into system risk analytic method of flood control engineering;防洪工程系统风险分析方法探讨
2.Stocks prices result from stocks market risks,which include system risk and non-system risk.股市系统风险将影响股票价格的运行方向,股市风险可分为系统风险与非系统风险。
3.At the same time,the emergence of system risk and non-system risk should be considered during the investment.同时,在投资中应考虑系统风险和非系统风险的出现,最后提出规避风险防范的措施。
4)systemic risk系统风险
1.The dissolution of the systemic risk of China stock market-The theoretical analyses based on "market of the lemon;中国股票市场系统风险的生成与化解—基于“柠檬市场”的理论分析(英文)
2.Rsk assets are characterized by volatility and jumps,moreover,these risk factors tend to be perfectly correlated across assets leading to systemic risk,the benefit from portfolio diversification implies by traditional models can been reduced.多风险资产会受到波动和跳跃风险作用,它们往往具有高度相关性,形成系统风险,因此由投资组合多样化所带来的收益相应会受到影响。
3.There is systemic risk in financial derivatives market.本文对金融衍生产品市场系统风险的有关问题进行了初步的分析,并对我国新生金融衍生产品市场在防范系统风险方面提出一系列监管建议。
5)systematic risks系统风险
6)non-system risk非系统风险
1.Stocks prices result from stocks market risks,which include system risk and non-system risk.股市系统风险将影响股票价格的运行方向,股市风险可分为系统风险与非系统风险。
2.At the same time,the emergence of system risk and non-system risk should be considered during the investment.同时,在投资中应考虑系统风险和非系统风险的出现,最后提出规避风险防范的措施。
3.Since the factors which influence the Price of Securities are different and restrict mutually, the Security Comhinations may reduce or put out the non-system risk effectively.由于影响各种证券价格的微观经济因素各不相同,其相互关联和彼此制约,使得证券组合投资可以有效地降低,甚或消除非系统风险。
延伸阅读

发电系统风险特性系数发电系统风险特性系数generation system risk characteristic factor tod一anx一tong fengx一an tex一ngx一shu发电系统风险特性系数(generation systemrisk eharacteristic faetor)用来近似表示发电系统风险度与强迫停运容t(或系统备用容t)的函数关系的参数,通常用m表示,单位是兆瓦(MW)。m是美国通用电气公司(General Eleetrie Com哪ny,GE)L.L.加弗(L.L.Garver)于20世纪60年代中期提出的一个可使系统可非性计算简化的系数(见发电机组有效载待客全)。 根据容t棋型(见发电系统模型)中的数据,将早积概率作为强迫停运容t的函数绘在半对数坐标纸上,可得到一条曲线(见图)。此曲线比较接近直线,可通过a、b两点的一条直线来拟合.取直线上的一段已b’为斜边作三角形,日的坐标为(X、.山),夕的坐标为(X,.击),便三角形两个顶点的纵坐标恰好相差。倍,即图中山/山二e,则此三角形底边对应的横坐标为为一为且等于所示系统风险特性系数。的值。因此,。值的大小反映了系统风险度对停运容t(或备用容t)变化的饭感程度。┌─┬─┬───┬───┬──┬──┬──┬─┐│\ │成│蔚荆 │肠曲自│. │ │ │ │├─┼─┼───┼───┼──┼──┼──┼─┤│口│口│飞 │门 │门 │口 │口 │曰│├─┴─┴───┼───┼──┼──┼──┼─┤│茄叔多 │岌 │丫} │{’ │ │ ││ }.} │ │ │ │ │ │├─┬─┬─┬─┴───┴──┼──┼──┼─┤│ │ │{ │,a,,1.’今 │天 │,扩│ ││ │ │ │ .一X‘,一力│ │认 │ │├─┼─┼─┼─┬───┬──┼──┼──┼─┤│口│口│口│口│口 │口 │口 │四 │口│├─┼─┼─┼─┼───┼──┼──┼──┼─┤│口│口│口│日│ │日 │日 │口 │因│└─┴─┴─┴─┴───┴──┴──┴──┴─┘吸迫停运容t .MW风险特性系数m的图示。的值可直接用算式求得.根据,的定义,图中拟合直线的纵坐标可表示为 A:=尸(x)=Be一荟(1)式中X为强迫停运容t,A二、P(X)为对应停运容tX的早积概率,B为常数与图中所选a、b两点的位t有关。 图中a、b二点的横坐标已给定为X。和X。,则对应的纵坐标可求得为凡和人,由式(1)可写出A。Be一会不一蕊二百-毕(2)将式(2)两边取对数后并加整理即求得二的表达式为 兀一Xa祝二-气声,r,二L3) In}生1 一L人J 应用式(3)计算,时,在形成系统的容t棋型后,必须预先给定人和凡的值。给定的原则是使它们包括的累积概率变化范围满足计算的擂要,因此,与系统风险度判据有关。例如,当系统年风险度判据取为。.ld/a时,取人今。.1和人、。.0003~。.。。04已可满足用260个工作日(美国及西欧)或312个工作日(亚洲和非洲一些国家)计算年风险度的需要。如风险度判据为其他值,可仿此调整图中a、b两点位t。凡、人一经确定,再由容量棋型查出对应的X。和X,,即可由式(3)求得m的值。