最大风险值,maximum risk value
maximum posterior risk最大后验风险
1.Hierarchical Bayesian method on the basis of maximum posterior risk;基于最大后验风险的多层Bayes方法
2.This paper gives a Bayesian plan of qualification test for production in binomial case by the reliability growth model, and the maximum posterior risk criterion for the Bayesian qualification test is proposed.提出了Bayes鉴定试验的最大后验风险准则,利用这种准则制定的鉴定试验方案综合了产品研制过程中的先验信息。
3.A plan of reliability qualification test for protecting the benefits of user is formulated by using Bayesian method in the view of maximum posterior risk.在确保使用方利益的前提下 ,从最大后验风险的角度运用贝叶斯方法制定了可靠性鉴定试验方案。
3)maximum flood hazard risk rate最大洪灾风险率
1.Taking Three Gorge reservoir as a case study, according to operation rule, we can effectively acquire the relationship between different flood season limit levels and maximum flood hazard risk rates.并以三峡水库为研究对象,根据调度运行原则,计算出了不同汛限水位与最大洪灾风险率的关系,供决策者进行权衡比较,帮助决策者在认真分析比较的基础上作出符合科学原则的风险决策。
4)minimax risk decision criteria最小最大风险决策准则
5)worst-case VaR最坏条件下的风险值
6)WCVaR最坏情景条件风险价值
延伸阅读

最大的最大收益值准则分子式:CAS号:性质:也称最大的最大收益值准则。不确定型决策准则之一。其方法是:首先找出各方案的最大收益值,然后选择这些最大收益值中最大者所在的方案作为最满意方案。这个准则采取乐观主义态度,把方案最大收益值(或最小损失值)的自然状态,作为必然出现的自然状态采看待,从而把不确定型决策问题化为确定性决策问题来处理。选择最大收益值中最大的方案(对损失值来说就是选择最小损失值中最小的方案)作为最满意的方案,即取“最有利中之最有利”方案,所以亦称为“乐观的决策准则”。