跨线运行,movement across lines
1)movement across lines跨线运行
1.These different systems result in the disunity of equipment and difficulties in the movement across lines.不同的系统造成设备的不统一,运营上又不能跨线运行
2)cross-line train列车跨线运行
1.The dedicated passenger railway can t have its own network shortly which cause lots of cross-line trains s existence, and the problem of choosing the joint-point between dedicated passenger railway and existing railwany line is the key factor influencing the operation of cross-line trains.由于短期内客运专线不能自成网络致使大量列车跨线运行,而客运专线与既有线衔接点的选择问题是影响列车跨线开行的关键性因素。
3)over-line transportation跨线运输
1.Our country is larger, people s tolerance on price is lower and the proportion of over-line passenger flow is higher, so the rational linkage of over-line transportation on PDL is the key of PDL s traffic organization.而我国国土面积较大,人们经济承受能力较发达国家低,跨线客流比例较高,因此,客运专线跨线运输的合理衔接是整个客运专线运输组织的关键。
英文短句/例句

1.Research on the Linkage of Transportation between Passenger s Dedicated Lines and Existed Railways;客运专线跨线运输衔接相关问题研究
2.Trans-regional Centre for Transport Infrastructure跨区域运输基建中心
3.(transportation) not on a regular route of a transportation system.(运输业)不在运输系统的规则线路上的。
4.land transportation radio services地面运输无线电业务
5.A nonscheduled airline or cargo plane.不定期航线或运输机
6.Key Construction Techniques on Fly-over Continuous Box Girder on Passenger Dedicated Line客运专线跨线连续箱梁施工关键技术
7.Galloping Computation and Analysis for Long Multi-span Bundle Conductors of Power Transmission Lines;大跨越高压输电线路分裂导线覆冰舞动的研究
8.Study on Nonlinear Galloping Theory for Long Conductors of Power Transmission Lines;大跨越高压输电线路非线性舞动理论研究
9.Dynamic Response of Long-Span Power Transmission Towers Subjected to Broken Wire大跨越输电塔在线路断线作用下的动力响应
10.Conductor Selection for ±500 kV Jiyang Large Crossing Transmission Line Upgrading±500kV吉阳大跨越输电线路增容改造导线选择
11.International Multi-modal Land Bridge Transportation Research and Analysis;国际多式联运大陆桥跨境运输通道研究与分析
12.First transatlantic radio by Guglielmo Marconi.古格列尔莫.马可尼首次跨洋传输无线电。
13.Study on Dynamic Behaviour and Wind|induced Vibration Response of Long Span Transmission Line System大跨越输电塔线体系动力特性及风振响应
14.Research on cables coupled effect of combo steel tube tower for large crossing transmission lines钢管组合大跨越输电塔导地线耦合效应研究
15.INFLUENCE LINE METHOD FOR TRANSPORT PROBLEMS ACROSS THE WALL OF THE NETWORK OF PERMEABLE TUBES可渗透管网络跨壁传输问题的影响线算法
16.SIMPLIFIED MODEL RESEARCH OF COMBO STEEL TUBE TOWER FOR LARGE CROSSING TRANSMISSION LINES钢管组合大跨越输电塔线体系简化模型研究
17.Time-domain analysis on wind-induced dynamic response of long span power transmission line systems大跨越输电塔线体系风振响应的时域分析
18.Studies on Wind Pulse-vibration Factor and Wind-induced Dynamic Response of the Long Span Transmission Line System of the Han River;汉江大跨越输电线路风振系数及风振响应研究
相关短句/例句

cross-line train列车跨线运行
1.The dedicated passenger railway can t have its own network shortly which cause lots of cross-line trains s existence, and the problem of choosing the joint-point between dedicated passenger railway and existing railwany line is the key factor influencing the operation of cross-line trains.由于短期内客运专线不能自成网络致使大量列车跨线运行,而客运专线与既有线衔接点的选择问题是影响列车跨线开行的关键性因素。
3)over-line transportation跨线运输
1.Our country is larger, people s tolerance on price is lower and the proportion of over-line passenger flow is higher, so the rational linkage of over-line transportation on PDL is the key of PDL s traffic organization.而我国国土面积较大,人们经济承受能力较发达国家低,跨线客流比例较高,因此,客运专线跨线运输的合理衔接是整个客运专线运输组织的关键。
4)crossed lines operation跨线运营
5)linear OTA线性跨导运放
6)cross-boundary passenger and freight services跨界客货运线
延伸阅读

CAXA-V2线切割软件在DK7725e线切割机床上的应用目前我国有大量的装有早期操作系统的数控设备,如何对其进行升级使这些设备重新焕发青春是摆在大家面前的一个很重要的问题。本文所介绍的正是这样的一个实例,文中所叙述的内容不仅对同类设备的改造具有现实意义,而且对其他类似设备的升级也有一定的借鉴作用。 苏州三光的DK7725e线切割机床的操作系统是基于DOS平台上的,而CAXA-V2线切割软件是在Windows 98平台上开发的应用软件。显然,我们无法直接将CAXA-V2线切割软件安装到DK7725e线切割机床的操作系统中。解决这一问题的关键是寻找二者的共同之处,那就是机床的后置处理和传输功能单元,即G代码程序。一、CAXA-V2线切割软件方面的操作1.进入绘图界面 在装有CAXA-V2线切割软件的计算机桌面上点击图标,进入该软件的绘图界面。2.绘制零件图 在软件的绘图区域中绘制线切割加工零件图,如图1所示。图1 线切割加工零件3.生成加工轨迹 利用“轨迹生成”指令,生成线切割加工零件的加工轨迹,同时确定穿丝点位置和补偿量。4.添加后置处理 由于CAXA-V2线切割软件并未提供DK7725e线切割机床的“后置处理和传输”,需要手工添加,具体操作过程如下:(1)点击CAXA-V2线切割软件的“后置处理和传输”图标,绘图区会弹出一个对话框。(2)选中“增加机床”图标,在弹出的对话框中用键盘输入“BKDC”后,按确定键返回,如图2所示。(3)在“后置处理和传输”的对话框中,按苏州三光的DK7725e线切割机床的“后置处理和传输”参数,手工输入相应的参数和指令,如图3所示。图3 机床类型设置(4)在“后置处理和传输”的对话框中点击“后置处理设置”后,相应地也会弹出一个对话框。该对话框中的参数要求也按苏州三光的DK7725e线切割机床的“后置处理设置”参数来设置,如图4所示。图4 后置处理设置5.生成G代码 完成上述设置后,点击“代码生成”指令,选择“G代码生成”后,再选中线切割加工零件的加工轨迹,该轨迹图线将由绿色变为红色,最后点击鼠标右键,弹出记事本对话框显示相应的G代码加工程序,如图5所示。