1)lead-time risk工期风险
1.In this paper, a lead-time risk transfer algorithm is presented, as well as the systematic analysis including risk evaluat.但由于其具有异地分布、多利益团体等特性 ,如何有效地进行工期风险控制成为一个非常关键的问题 。
英文短句/例句
1.Risk Analysis on the Hangzhou Bay Bridge during Project Construction;杭州湾跨海大桥项目施工期风险分析
2.Study on Risk Analysis Method of Long-span Bridges during Construction;大跨度桥梁施工期风险分析方法研究
3.A Method of Project Schedule Risk Transmission based on PERT;基于PERT的项目工期风险传递机制
4.An Analysis of Period Risk Based on Fuzzy Synthetical Evaluation Method基于模糊综合评判法的工期风险分析
5.Study on Weight Analysis in Period Risk Assessment of Hydropower Project;水电工程工期风险评价中的权重分析研究
6.Study on the Resource Leveling and Project Risk of Highway Engineering公路工程中资源均衡与工期风险的研究
7.Project Schedule Chain-cutting Risk Control Based on Critical Chain;基于关键链的项目工期风险断链式控制研究
8.Evaluation and Control of the Lead-time Risk of the System Integration Project with Risk Transfer Algorithm;系统集成项目的工期风险传递算法及评价控制
9.The Research on Fuzzy Network Planning Technology and Fuzzy Schedule Risk模糊网络计划技术及模糊工期风险研究
10.Practice and consideration on risk evaluation consulting of Jiangbian hydropower project in construction period江边水电站施工期风险评估咨询实践与思考
11.Engineering Insurance and the Construction Project Put Scheduled Time Risk Administration into Practice工程保险与建设工程实施期风险管理
12.Evaluation Method Research on Tunnel and Risk Analysis of Construction Time;隧道工程风险分析方法及工期损失风险研究
13.Study on the risk-based determination of the premium rate in breakwater construction;基于风险量化防波堤工程施工期保险费率厘定
14.Analysis of risk probability of construction time for Taihangshan tunnel;太行山隧道施工工期的风险概率性分析
15.Risk management control of Wanliu car depot time limit plan and construction under the high voltage cable万柳车辆段工期和高压线下施工风险管理控制
16.Risk Acceptance Criteria of Long Large Tunnels in Construction Period;长大隧道工程建设期风险接受准则研究
17.Risk Management Technology in the Construction Period of Engineering Project of Jinbin Light Rail Transit;津滨轻轨工程项目建设期风险管理技术研究
18.The Risk Distribution Study in the Life-Cycle of the Engineering Project;工程建设项目生命周期过程中的风险分布研究
相关短句/例句
duration risk工期风险
1.In the duration risk, combined with previous research results and according to the uncertain duration of the work, I made a method of calculating the probability of completion of work .在工期风险方面,本文结合前人的研究成果,根据各个工作持续时间的不确定性,提出了不同工作下的工作完工概率计算方法;并根据网络中线路的合成分析,用终点最早完成时间的期望值和方差作为网络工期的期望完成时间和方差,得到了工期的概率分布函数。
3)construction Period risk工期风险率
1.In consideration of the Probobilistic nature of effective construction period in construction period of overtop cofferdam in first stage,this Paper firstly Puts forward the conception of construction Period risk.针对过水围堰初期导流围堰使用期内有效施工工期的随机特性分析,结合水电工程建设实际,提出了工期风险率的概念,并给出了研究工期风险率的计算模型。
4)risk of construction period施工期风险
5)duration risk evaluation工期风险评估
6)lead-time risk control工期风险控制
延伸阅读
风险投资的风险风险投资的风险是指投资活动中人们不希望的后果出现的潜在可能性。
