刚性梁,buckstay
1)buckstay刚性梁
1.Issues on Design of Buckstay for Utility Boiler;电站锅炉刚性梁设计的几个问题
2.The main arrangement style and calculation of buckstay during the design for 600MW super critical boiler are introduced.本文简要论述了哈锅600MW超临界锅炉刚性梁在设计过程中一些主要部件的布置形式及其计算,以及刚性梁的设计原理;同时简单介绍了刚性梁的连接形式。
3.According to the explosion of enclosure wall tube base connected to ring header,the heat leakage caused by corner crack of burner cover which led to shaking of boiler wall,this paper analyzes the installation and operation of buckstay,the transformation measures were worked out.针对尾部环形联箱包墙管管座爆漏、燃烧器罩壳角部开裂导致漏热和炉墙晃动等问题,从刚性梁系统安装运行方面加以分析探讨,制定了刚性梁系统改造措施,达到减少和防止管座爆漏,提高电厂运行安全率的目的。
英文短句/例句

1.Study on Earthquake Resistance of Rigid Beam-to-Column Connection of Steel Structure;钢结构刚性梁柱节点抗震性能的研究
2.Study on Semi-rigid Beam-to-column Connection in Steel Structure Resident Houses;钢结构住宅半刚性梁柱节点性能研究
3.Seismic behavior of steel moment connection with welded haunch钢框架加腋刚性梁柱节点的性能研究
4.Study on Mechanical Behavior of Top and Seat Angle Connections上下翼缘角钢半刚性梁柱节点的力学性能研究
5.Behaviour of Semi-Rigid Beam-to-Column Minor Axis Connections in Steel Frames;钢框架梁柱弱轴半刚性连接性能研究
6.The Analysis of Weak Beam Steel Moment Frames under Cyclic Load;弱梁刚性连接钢框架的抗震性能研究
7.Behavior of Rigid Beam-to-column Connection with T-stub;T形件连接的梁柱刚性节点性能分析
8.Elastic-plastic analysis of steel frame with beam-column semi-rigid connections梁柱半刚性连接的钢框架非线性分析
9.Study on Anti-Seismic Performance Testing of New Type Beam-to-Column Connections in Steel Frames框架刚性连接梁柱节点抗震性能研究
10.The Study on Transverse Distribution of Curved Beam Based on Rigid-crossbeam Method;基于刚性横梁法的曲线梁桥横向分布的研究
11.Modelling Beam-to-Girder Semi-Rigid Composite Connection with Angles Including the Effects of Concrete Tension Stiffness考虑混凝土拉伸刚度的梁-钢桁梁混凝土半刚性组合节点模型
12.testing method for stiffness of plastics by means of a cantilever beam塑料刚性试验方法-悬梁法
13.Dynamics of an elastic beam in large overall motion作大范围运动弹性梁的动力刚化分析
14.The Research on Stability of the Combinational Bridge with Rigid Frame and Single-ribbed Tied Arch;刚构—单肋系杆拱组合桥梁稳定性研究
15.Coupling Deformation Effect on Flexible Hub-Beam System中心刚体-柔性梁系统的耦合变形影响
16.Dynamic Performance and Seismic Response Study of Beam-T Continuous Rigid-frame Bridge;T梁连续刚构桥动力性能与地震特性研究
17.The Analysis of Seismic-Resistant Behavior of New Type Beam-to-Column Web Rigid Connections in Steel Moment Frames;新型钢框架梁柱腹板刚性连接抗震性能分析
18.The Analysis of Behavior of Beam-to-Column Web Moment Connections in Steel Frame;钢框架梁柱腹板刚性连接的节点性能分析
相关短句/例句

rigid beam刚性梁
1.The low cycle vibration problems of water wall and rigid beams existing on 1000 t/h boilers of Shandong Zouxian Power Plant were investigated and studied.对邹县发电厂1000t/h锅炉水冷壁及刚性梁低周振动进行了现场调查研究,从设计安装、设备系统和运行操作3方面详细分析引起水冷壁及刚性梁低周振动的原因。
2.and as compared with the method of rigid beam it is practieally proved that is a very convenient and reliafle method of calealation which is suitably used for application of engineering.通过弹性理论找出挑梁下砌体应力的简化计算方法,并举工程实例与刚性梁法作比较,实践证明是一种方便且可靠的计算方法,利于工程应用。
3)rigid-plastic beam刚塑性梁
4)rigid tie beam刚性系梁
5)rigid strutbeam刚性垫梁
6)stiffening beam刚性连梁
1.In this paper, the realization methods of coupled shear walls with a stiffening beam(CSWSB) and its passive control behavior are investigated.本文研究带刚性连梁的双肢剪力墙及其结构控制性能。
2.In this paper,the continuum methed is used to analyse the structure of cou-pled shear walls with stiffening beam.本文利用连续化方法分析带刚性连梁的双肢剪力墙结构,按实际受力将刚性连梁的作用分布在其影响范围内,推导出墙肢内力、连梁内力的显函数表达式。
延伸阅读

刚性梁刚性梁buckstay  刚性梁上还装有设t锅炉膨胀中心所必需的导向装里.由于刚性梁布里在炉外,结构设计时要充分考虑炉壁热膨胀的影响,连接处允许有一定的相对位移. 刚性梁系统的设计与受它保护的受压部件密切相关,必须以管子的应力分析为基础,使管子和刚性梁本身在炉膛设计压力、风载和地展荷载作用下有足够的强度和刚性。各层刚性梁的间距要满足应力分析的要求并考虑整体布t的合理性;刚性梁的最大挠度也不应超出允许值。对于管子允许变形较小的特殊部位,应严格计茸并采用专门结构。gongxlng}long刚性梁(buckstay)围绕并悬挂在悬吊式炉炉壁外周,对炉壁起保护作用的钢结构系统。它的用是增强炉膛和尾部烟道的刚性,减小炉墙的振动,防止炉墙因变形过大而开裂(如图)。当炉膛内压力剧变化,如燃料爆燃或因熄火等原因造成外爆或内时,可保护管子不受损坏。对于设置了膨胀中心的炉,还可起到固定膨胀中心的作用,并将锅炉受到的载、地震荷载和导向荷载传递到钢结构上。里,七卜J人当肺.盯口月吸固回带 冈JJ性梁 刚性梁按其结构可分为绕带式和栅格式两类。格式刚性梁只用于大容量或双炉膛锅炉,中国制造锅炉多采用绕带式。它的特点是,沿炉膛高度每隔乏4m布置一圈用大型号工字钢组成的水平刚性梁.层之间有时还设有垂直布置的槽钢,用以克服刚性自重引起的外翼缘下沉,保持梁的水平。为保证炉膜焰角、冷灰斗、燃烧器等区域的整体刚性,在这些铆往往要采用比较复杂的平面或空间析架系统。对炉也需采用特殊结构的防护。在沿炉高上、中、下的三脸内多聆斤立页且