桩号,Mileage
1)Mileage[英]['ma?l?d?][美]['ma?l?d?]桩号
1.Computational Method of Arbitrary Point Mileage in the Process of Transition Curve Tunnel;在缓和曲线隧洞放样中任意点的桩号计算
英文短句/例句

1.Vertical include the mark of roadway stake, traverse and endlong, the earthwork of roadway, count and label of level grade.竖向包括道路桩号、断纵断、路土方、高坡度计算标注等功能。
2.Pile foundation inclined pile excavation construction of the No.4 bridge pier of Wulongyangjiao Wujiang large Bridge武隆羊角乌江大桥4号桥墩桩基斜桩开挖施工
3.Signal Analysis of Pile Based on Wavelet Theory;基于小波理论的桩基信号处理与分析
4.Application of CFG pile on the No.3 line of Shenzhen subwayCFG桩在深圳地铁3号线中的应用
5.Reservoir Modeling and Remaining Oil Research of Zhung39 Block in Wuhaozhuang Oilfield;五号桩油田桩39井区油藏地质建模与剩余油分布研究
6.Construction of Long and Large Diameter Bored Piles of Main Pier No.48 Foundation of Zhanjiang Bay Bridge湛江海湾大桥48号主墩超长大直径桩基施工
7.Study on the pile soil layers resistance mutations impact on the low strain detection signal桩侧土层突变对低应变检测信号影响的探讨
8.Geochemical characteristics of high-waxy oil in Wuhaozhuang Area of Zhanhua Sag沾化凹陷五号桩地区高蜡油地球化学特征
9.Application of low grade cement pile rigid complex foundation低标号混凝土桩刚性复合地基的工程应用
10.Underpinning construction scheme for Shanghai metro line 10 passing through pile foundation of bridge上海地铁10号线穿越桥梁桩基础托换施工方案
11.The Baogang high stove No.1 steel pile foundation sink decline develop the regulation宝钢一号高炉钢管桩基础沉降发展规律
12.Boring Technique for Bored Piles of Main Bridge Pier No.7 of Dashengguan Changjiang River Brigde in Nanjing南京大胜关长江大桥7号墩钻孔桩成孔技术
13.On the application of the cast-in-place bored piles' reverse circular technique in No.3 Bridge of Wei river钻孔灌注桩反循环工艺在渭河三号桥中的应用
14.The application of CFG pile in foundation treatment of signal building in existing stationCFG桩在既有车站信号楼地基处理中的应用
15.Application of San Compaction Piles in the Soft Ground Consolidation of Berth 5# and 6# of Humen Port挤密砂桩在虎门港5号、6号泊位工程软基加固中的应用
16.Design of Direct and Inverse Interpretation System of Low Strain Dynamic Testing of Foundation Pile and Development of Data-Collecting Module of Dynamic Testing Signal;基桩低应变动测正反演分析系统设计及动测信号采集模块开发
17.Analysis of the Applying Pile Foundation Underpinning Technology in Xin Gang 4th Road Subway Project桩基托换技术在新港四号路地道工程中的应用分析
18.Examples of Identifying Abnormal Signal of Concrete Defects in the Ultrasonic Pile Testing基桩超声波检测中混凝土缺陷异常信号的识别实例
相关短句/例句

the landmark of highway里程桩号
3)The system of stake number桩号系统
4)Design stake number设计桩号
5)Construction stake number施工桩号
6)Management stake number管理桩号
延伸阅读

大同卧虎湾1号、2号辽墓壁画大同卧虎湾1号、2号辽墓壁画  墓址在山西大同市城北郊约3公里多。1954年发现。西为1号墓,东为2号墓。两墓壁画相同,2号墓较完整。2号墓墓门东西两侧壁各画l门卫,西壁画车马出厅图,其中有驼车,另有宴饮图1幅。东壁画乐队12人,各执乐器,排列有序,正在吹奏;上部画l衣架,架右立l女侍,架后站1男侍。北壁绘花卉山石围屏5条,上有蓝黄色卷帷幔,西侧立女侍捧盘,东侧立童侍捧唾盂。1号墓西壁画车马出行图,其中亦有驼车,另有两组饮宴图。北壁画花卉围屏5条,上方画帷幔,西侧立1女侍,东侧立l童侍。墓门两侧壁面各画l门卫,执竿而立。