施工导流,construction diversion
1)construction diversion施工导流
1.Construction diversion tunnel design for Naen HPP;那恩水电站施工导流隧洞设计
2.Application of Galerkin meshless method to two-dimensional numerical simulation of construction diversion;无网格伽辽金法在施工导流二维数值模拟中的应用
3.Integrated risk of construction diversion system based on the Monte-Carlo method;基于Monte-Carlo方法的施工导流系统综合风险分析
英文短句/例句

1.Diversion cofferdam design and the construction of Huilong hydropower station回龙水电站施工导流围堰设计与施工
2.Guide for design of construction diversion for hydropower and water conservancy project水电水利工程施工导流设计导则
3.Study on Decision Making of Construction Diversion Scheme;水利水电工程施工导流方案决策研究
4.Study on Value η of Outlet of Diversion Tunnel in Model Test施工导流模型试验中导流洞出口η值的研究
5.The Optimization Study of Construction Diversion Buildings in Xiaowan Power Station;小湾水电站施工导流建筑物优化研究
6.Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;混凝土面板堆石坝施工导流标准及施工期渡汛措施研究
7.Hydraulic Optimization in Overflow of Cofferdam and Dam in River Divertion during Construction;施工导流中围堰及坝体过流水力优化计算
8.The Research on Risk Management of Construction Diversion of Low-head Navigational Junction;低水头航运枢纽工程施工导流风险管理研究
9.Construction Diversion Scheme and Countermeasure of Sihugou Hydro-Junction Project;四湖沟水利枢纽工程施工导流方案与对策
10.Multi-objective Risk Decision Analysis of Construction Diversion Standards for Hydropower Project;水电工程施工导流标准多目标风险决策研究
11.On diversion and drainage scheme of construction of Daliuta area rubber dam project大柳塔小区橡胶坝工程施工导流及排水方案
12.Research and Design of CAD System of Channel Diversion--CAD for Construction Diversion;明渠导流CAD系统研究与设计——施工导流计算机辅助设计
13.Application of CAD in Construction of Channel Diversion;计算机辅助设计在施工导流中的应用——明渠导流CAD(DLCAD)
14.The Quality Control in the Construction of High-pressure Jet-grouting Watertight Wall of the Construction Diversion Cofferdam of Longhuakou Hydropower Station龙华口水电站施工导流围堰高喷防渗墙施工质量控制
15.Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;向家坝水电站施工导流过程仿真与优化研究
16.Multi-objective Risk Model of Optimal Construction Diversion Standards Based on Entropy Weight;基于熵权的施工导流标准多目标风险决策研究
17.Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;向家坝水电站施工导流动态可视化研究
18.Study on Large-scale Channel Diversion and the Key Technologies of Construction Closure大型导流明渠截流施工关键技术研究
相关短句/例句

River diversion施工导流
1.Essential problems in the process of construction planning for LHP are discussed in this paper, such as the pre_stage engineering design, bid preparation for main structures, river diversion, controlling construction schedule and methods for RCC dam constrction, etc.介绍龙滩工程施工规划设计中的几个主要问题 ,包括前期工程设计、主体土建工程分标、施工导流、施工控制性进度及碾压混凝土坝施工方案等。
2.The effects of various hydraulic factors on river diversion risk are analyzed.本文利用改进的一次二阶矩法计算导流风险,分析了水力因素对施工导流综合风险计算的影响,并具体分析了各水力不确定性因素在综合风险计算中的作用。
3.Consequently, research works must be done not only on stability of cofferdam feet, channel scour, protection of the bank and so on, but also on navigation problems and salvation of downstream river during river diversion construction.我国在建或规划设计中的大型水电站主要集中在大江大河的干流上,其电站规模巨大,施工导流工期较长,在施工导流期间不仅需要研究围堰堰脚稳定、河床冲刷、岸坡保护等问题,还需要考虑施工导流期间通航、下游河道淤积等问题。
3)diversion construction导流施工
4)construction diversion and closure施工导截流
1.To solve the problems existed in construction diversion and closure system simulation at present such as hard modeling of simulation computation, poor transplantablity of program, separation between computation and data results, and difficult realization of simulation visualization, structural drawing-oriented simulation theory and method is presented in this thesis.针对目前施工导截流系统仿真中存在的仿真建模复杂、程序通用性差,仿真计算与数据生成过程相分离以及仿真可视化难以实现等问题,本文提出了面向结构图的施工导截流系统仿真理论与方法。
5)flood diversion for the construction period施工导流流量
1.The optimal design method which the flood diversion for the construction period can be reduced for construction of the downstream cascade reservoirs by changing reservoir operation for regulation reservoir on the upper reaches of cascade reservoir was presented in the paper.通过汛期临时改变梯级水库上游可调节水库运行方式,提出减小梯级水库下游工程施工导流流量的优化设计方法,并以黄河上游积石峡水电站施工导流流量的优化设计为例进行分析计算。
6)3rd-phase construction diversion三期施工导流
延伸阅读

施工导流施工导流constructiondiversion在水域内修建水利工程的过程中,为创造干地施工条件,用围堰围护基坑,将河水通过预定方式导向下游的工程措施。导流方案的选定关系到整个工程施工的工期、质量、造价和安全度汛,事先要有周密设计,施工要像对待主体工程那样重视。导流方式分河床外导流与河床内导流。前者用围堰一次拦断整个河床,河水通过河床外的导流泄水建筑物导向下游;后者用围堰先后分段围护部分河床,河水通过被束窄的另一部分河床导走,即分期导流。按泄水建筑物类型分,有明渠导流、涵洞或隧洞导流,以及坝体底孔、梳齿或缺口过流等导流方式。涵洞导流多用于中小型水闸、土石坝等工程,底孔导流用于混凝土坝施工。梳齿导流则是在混凝土坝施工时预留梳齿状缺口过水,随坝体升高,分级轮换封堵缺口。