糯扎渡水电站,Nuozhadu Hydropower Station
1)Nuozhadu Hydropower Station糯扎渡水电站
1.Environment impact assessment of Nuozhadu Hydropower Station;糯扎渡水电站的环境影响评价
2.Research on River Closure Model Test of Nuozhadu Hydropower Station;糯扎渡水电站截流模型试验研究
3.Experimental study on flow-induced vibration in spillway chute of Nuozhadu Hydropower Station;糯扎渡水电站溢洪道泄槽流激振动试验研究
英文短句/例句

1.Construction ventilation for power tunnel system of Nozhadu Hydropower Station糯扎渡水电站引水发电系统施工通风
2.Analysis of seepage field for underground power house of Nuozhadu Hydropower Station糯扎渡水电站地下厂房区渗流场分析
3.Core Rock-fill Dam Construct-Planning Introduction of Nuozhadu Hydropower Station糯扎渡水电站心墙堆石坝施工规划简介
4.Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;糯扎渡水电站地下厂房洞室群施工顺序研究
5.Modeling and Simulation of Construction of Spillway Excavation of Nuozhadu Hydropower Station;糯扎渡水电站溢洪道开挖施工系统建模与仿真
6.Development goals of Nuozhadu Hydropower Project and research on investment apportionment;糯扎渡水电站工程开发任务与投资分摊研究
7.Study on Environmental Impact Monitoring in Construction Period in Nuozhadu Hydropower Plant糯扎渡水电站施工期环境影响监测讨论
8.Experimental blasting quarrying of construction material for zone Ⅰ of dam of Nuozhadu Hydropwer Station糯扎渡水电站大坝Ⅰ区料开采爆破试验
9.Expediting Nuozhadu Hydropower Station Boosting Yunnan Province as the Main Hydroenergy Sources Base of China;加快糯扎渡水电站建设 把云南省建设成全国重要的水电能源基地
10.The Water Enviromental Management Information System Based on GIS of Nuozhadu Hydraulic Power Plant;基于GIS的糯扎渡水电站水环境管理信息系统研究
11.Analysis on the Water-rock Interaction of Stilling Basin Slope of Nuozhadu Hydropower Station;糯扎渡水电站溢洪道消力塘边坡水岩作用机理研究
12.Study on the Rock Mass Structure Characteristic and Stability of Tailrace Tunnel Vent Slope of Nuozhadu Hydropower Station;糯扎渡水电站尾水出口边坡岩体结构特性及稳定性研究
13.Systematical Study on Engineering Geology of the Excavation Slopes Stability of Nuozadu Hydro-power Station in Lancang River;澜沧江糯扎渡水电站开挖边坡稳定性工程地质系统研究
14.Research on Formation Mechanism of Deeper Rip in Slope at the Dam of Nuozadu Hydro-electrical Power Station;澜沧江糯扎渡水电站坝区斜坡深部拉裂的形成机制研究
15.A Study on Conditional Evolution of Discharging Atomization Slope Stability in Nuozhadu Hydropower Station;糯扎渡水电站泄洪雾化区斜坡稳定条件演化研究
16.Study on Stability of the Quasi-bedded and Counter-tilt Rock Slope in Right Bank Diversion Tunnel Inlets of Nuozhadu Hydropower Station;糯扎渡水电站右岸导流洞进口似层状反倾岩质边坡稳定性研究
17.Study on Dynamic Visual Simulation and Optimization for Construction Site Layout of Nuozadu Hydropower Station;糯扎渡水电站施工总布置动态可视化仿真与优化研究
18.Study on the Stability of Spillway High Steep Man-Made Slope of Nuozadu Hydroelectric Power Station in Lancang River;澜沧江糯扎渡水电站大型溢洪道高陡工程边坡稳定性研究
相关短句/例句

Nuozhadu hydropower project糯扎渡水电站
1.River closure construction of Nuozhadu hydropower project;糯扎渡水电站大坝工程截流施工
2.Seepage Deformation Test and Study of Impervious Earth Material for Nuozhadu Hydropower Project;糯扎渡水电站防渗土料抗渗透变形试验研究
3.Nuozhadu hydropower project is located in an area where the engineering geology conditions are rather complicated, and in particular a structural soft rock zone exists in the right bank of the damsite, which have a great impact on the engineering geological conditions of the dam foundation.糯扎渡水电站工程地质条件复杂,尤其是坝址右岸存在的构造软弱岩带,对坝基的工程地质条件影响极大,该软弱岩带存在渗透变形问题。
3)Nuozhadu reservoir糯扎渡水库
4)nuozhadu糯扎渡
1.Study on Eearth-rock Transportation and Dam Filling Schedule of High Core Rock Fill Dam for Nuozhadu Hydropower Station;糯扎渡水电站心墙堆石坝土石方调运及坝体填筑进度分析
2.Brief Talk on Impacts and Countermeasures on Ecological Environment from Nuozhadu Hydropower Plant Development糯扎渡水电站开发对生态环境的影响及防治浅谈
3.Based on the testing data of the triaxial consolidation tests on the upstream main rockfill materials used to build the dam in Nuozhadu hydropower station under different stress paths,the shear strength and stress-strain properties are studied and the stress-strain parameters of the rockfill materials are obtained.通过对云南澜沧江糯扎渡水电站坝体I区筑坝堆石料在拟定应力路径下的三轴固结排水剪切试验数据分析,获取了堆石料的应力–应变参数。
5)Nuozhadu project糯扎渡工程
6)Nuozadu Dam糯扎渡大坝
1.The filter material and gravel stone material produced by stone material processing system are the main materials for the Nuozadu Dam,so making full preparation of material is the important guarantee for normal construction of the dam.糯扎渡大坝石料加工系统生产的反滤料及掺砾石料是填筑大坝的主要原料之一,按时备足料是大坝正常施工的重要保证。
延伸阅读

野渡1.荒落之处或村野的渡口。