长洲水利枢纽,Changzhou Hydraulic Complex
1)Changzhou Hydraulic Complex长洲水利枢纽
1.Optimization of construction diversion scheme for Changzhou Hydraulic Complex;长洲水利枢纽工程施工导流方案优化
2.Navigation Design during Construction Period in 3rd-phase Construction Diversion and River Closure of Changzhou Hydraulic Complex;长洲水利枢纽工程三期施工导截流期施工通航设计
3.Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex;长洲水利枢纽库区移民安置规划设计
英文短句/例句

1.Safety Management of Changzhou Hydraulic Complex and Buckets Effect长洲水利枢纽安全管理与“水桶定律”
2.Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex;长洲水利枢纽库区移民安置规划设计
3.Characteristics of Resettlement for Villages at Reservoir Area of Changzhou Hydraulic Complex;长洲水利枢纽工程库区农村移民安置实施特点
4.Study on Amendment of Unit Discharge Calculated Curve of Changzhou Hydraulic Complex长洲水利枢纽机组出流量计算曲线修正研究
5.1st Phase River Closure Engineering on Outer River of Changzhou Hydraulic Complex长洲水利枢纽工程一期外江截流施工技术
6.Quality Control over Concrete Appearance for Power House on Outer River of Changzhou Hydraulic Complex长洲水利枢纽外江厂房混凝土外观质量控制
7.Foundation Treatment for Works on Inner and Mid Rivers of Changzhou Hydraulic Complex长洲水利枢纽内江、中江工程地基处理施工
8.Initial Economic Operation and Optimal Scheduling of Power Station at Changzhou Hydraulic Complex长洲水利枢纽电站初期经济运行与优化调度
9.Temperature Control over Concrete Engineering for Works on Inner River of Changzhou Hydraulic Complex长洲水利枢纽内江工程混凝土施工温度控制
10.Function Design and Implementation of AGC at Changzhou Hydraulic Complex长洲水利枢纽工程AGC功能设计及实现方法
11.Analysis on Phase-lead Operation of Generator at Power Station of Changzhou Hydraulic Complex长洲水利枢纽电站发电机进相运行分析
12.Design and Functional Characteristics of Computer Monitoring System at Changzhou Hydraulic Complex长洲水利枢纽计算机监控系统设计及功能特点
13.Thought of the inspection of Changzhou Hydro-junction Project关于长洲水利枢纽工程考察学习的思考
14.Design and Construction of Revetment for Main Works of Changzhou Hydraulic Complex长洲水利枢纽主体工程护坡设计施工探究
15.New Problems for Lower Route Maintaing of Changzhou Water Control Pivot and Solutions长洲水利枢纽坝下航道维护新问题及对策分析
16.Comprehensive Supervision on Environmental Protection and Water & Soil Conservation of Changzhou Hydraulic Complex长洲水利枢纽环境保护和水土保持监理实践体会
17.High Pressure Swing Grouting at Lower Water Cofferdam Downstream Ship Lock of Changzhou Hydraulic Complex长洲水利枢纽船闸工程下游低水围堰高压摆喷施工工艺
18.Temperature Control Measures for Concrete Engineering of Works on Outer River of Changzhou Hydraulic Complex长洲水利枢纽外江工程混凝土施工温控措施总结
相关短句/例句

Changzhou Multi-purpose Water Project长洲水利枢纽
1.Computer Monitoring System Design for Double-line Single Ship Lock of Changzhou Multi-purpose Water Project;长洲水利枢纽双线单级船闸计算机监控系统设计
2.Safety and Stability Control System Design andStrategy Study for Changzhou Multi-purpose Water Project;长洲水利枢纽电站安全稳定控制系统设计及策略研究
3.Navigation Design in Construction Period for Changzhou Multi-purpose Water Project;长洲水利枢纽工程施工期通航设计
3)power station of Changzhou Hydraulic Complex长洲水利枢纽电站
1.This paper studies how it finds local overheat at fixed flange of enclosed bus expansion joint of 1# generator-transformer unit at the power station of Changzhou Hydraulic Complex.介绍了长洲水利枢纽电站1号发变组封闭母线伸缩节固定法兰处局部过热缺陷的发现过程,经详细分析其发生原因,针对这些原因采取了相应的处理措施。
2.The phase-lead depth of generator at the power station of Changzhou Hydraulic Complex is learnt through unit phase-lead test based on analysis on static stability of synchronous generator.从分析同步发电机静态稳定入手,通过机组进相试验,从而掌握长洲水利枢纽电站发电机的进相深度。
4)Changzhou Hydraulic Complex长洲水利枢纽工程
1.Function Design and Implementation of AGC at Changzhou Hydraulic Complex长洲水利枢纽工程AGC功能设计及实现方法
2.Electrical Primary Design of Changzhou Hydraulic Complex长洲水利枢纽工程电气一次设计
5)Gezhouba Hydroproject葛洲坝水利枢纽
1.River Regime Regulating Works at Lower Reach of Gezhouba Hydroproject;长江葛洲坝水利枢纽下游河势调整工程
2.The construction and operation of Gezhouba hydroproject brought impact on the stage discharge relation during medium and low water period.葛洲坝水利枢纽动工修建和运行 ,对该站水位流量关系中低水部分产生了影响。
3.Gezhouba hydroproject was impounded and put into operation in 1981.葛洲坝水利枢纽于 1981年蓄水运用 ,为了掌握其对下游河道的影响 ,长江委荆江局对下游宜昌—城陵矶河段进行了原形观测和分析。
6)Gezhouba hydro project葛洲坝水利枢纽
1.Anti-corrosion methods for metal structures used in Gezhouba hydro project;葛洲坝水利枢纽金属结构防腐蚀方法
2.Research on filter in foundation drain hole of Gezhouba hydro project;葛洲坝水利枢纽基础排水孔过滤体研究
延伸阅读

铁门水利枢纽

铁门水利枢纽

Iron Gate Hydroproject 概  述   铁门水利枢纽由罗马尼亚和南斯拉夫两国合建。位于多瑙河干流上,距河口942.95km,距离最近的城市为德罗贝塔图尔努塞韦林(Drobeta Turnu Severin)市。工程主要用于发电、航运。混凝土闸坝、最大坝高60.6m,水库总库容25.5亿m3,水电站总装机容量205万kW,年平均发电量105亿kW·h。工程于1964年开始准备工作,1969年7月1日第一座船闸(罗方)通航,1970年6月第一台机组发电。1972年5月竣工。工程总造价4亿美元。   铁门坝址以上为107km长的峡谷河段,水力蕴藏量较大,占多瑙河水力蕴藏量的四分之一,但它又是多瑙河通航的最大障碍。坝址以上控制流域面积56万km2,根据140年的水文资料,坝址处最大流量15900m3/s(1895年),最小流量1190m3/s(1893年),平均流量5520m3/s,年输沙量4000万t。   坝址基岩为震旦系结晶片岩,岩质坚硬,裂隙中等发育,在下游有小的断裂,并有中生代灰岩、砂岩及泥质页岩出露。 枢纽布置   铁门水利枢纽的主要建筑物包括一座溢流重力坝、两座发电厂房、两座船闸等。挡水前缘总长1278m。   混凝土溢流重力坝位于河流中间,长441m,共14孔,每孔设宽25m,高14.86m的双层闸门,最大泄量15400m3/s。闸下游用消力斗消能,未做护坦,但运行后,基岩有局部冲刷。另有6孔冲沙闸,加上水轮机过流量和其它泄水设施,总共可宣泄22500m3/s流量,相当于千年一遇洪水。两岸非溢流坝为土坝,左岸的长117m,右岸的长186m。   溢流坝两旁各设一座长214m的厂房,各装6台水轮发电机组。水轮机额定容量17.8万kW,转速71.5r/min,直径9.5m,计算平均水头27.16m,最大水头34.5m,最小水头19.15m。厂房宽25m,长26m,高75.8m。总过流量8700m3/s,实际运行,当水头在21.6m以上时,水轮机额定出力可提高到19.4万kW。   厂房旁左右岸各有一线两级船闸,闸室长310m,宽34m,右岸船闸槛上最小水深5m,净空13.5m,左岸船闸槛上最小水深4.5m,净空10.5m,可通过载重5000t的海轮或9艘1200t驳船和1艘拖轮,过闸时间70~80min,年过船能力5000万t。   开关站设于两岸,罗方为2回220kV和2回400kV,南方为2回400kV,另有1回400kV与罗马尼亚相联,均可输电100万kW。南斯拉夫用架空线跨越船闸,罗马尼亚则用电缆在船闸下通过。 工程施工   整个主体工程的工程量为开挖覆盖层1341万m3,岩石724万m3,回填土石方381万m3,浇筑混凝土、钢筋混凝土316万m3,使用钢筋钢材16.7万t,设备6.87万t。铁门水利枢纽采用明渠导流,分两期导流。   (1)第一期导流。第一期导流先围两岸岸边,左岸基坑内包括左岸厂房和船闸,右岸基坑内包括右岸船闸和厂房以及1~3号泄水闸。二期基坑内包括4~14号泄水闸。   左岸纵向围堰长434m,由直径18m,高14~16m、间距4m的24个钢板桩格体组成。格型围堰通过8~14m高的堆石围堰与左岸连接,堆石围堰用拉尔森板桩墙防渗。   1965~1969年施工期间,利用两岸围堰间276m宽的明渠导流。百年一遇的施工设计洪水流量为16300m3/s。   (2)第二期导流。第二期导流从1969年9月至1971年3月,历时18个月。先将第二期围堰的戗堤填筑到44.5m高程,然后上游戗堤填筑到53.5m高程,形成第二期导流的上游围堰,下游戗堤填筑到45m高程,形成第二期导流的下游围堰。上、下游围堰均采用拉尔森板桩防渗。   在第二期导流期间,50年一遇的施工设计洪水从三孔泄水闸、6个排沙底孔通过;从左岸船闸通航;超过设计洪水时,则打开所有船闸过水。   截流采用立堵进占结合栈桥平堵的方法,截流流量3390m3/s,流速7.15m/s,落差3.72m。龙口宽60m。截流于1969年8月11日完成,历时3.5d,截流的抛投量为12t混凝土块体1288块、25t312块、四脚体110块、6~20t石块2400块,20~30t1491块。   左岸大部分砾石取自该河江心洲。用挖掘机或2.4m3索铲挖掘机采料,用27t自卸卡车运至料场,然后用400t/h双线缆索道将料卸入筛分装置。大骨料堆置于露天,细骨料存放于贮仓内。   混凝土日产量为3000m3。用三台缆索式起重机浇筑。为了防止温度裂缝,船闸顺轴向分为12.5m一块,不超过250m2,每层2~8m;厂房钢筋多,每块300m2,高2~10m;溢流坝宽42.5m,平均350m2,每层2m,一般浇一层侧面停5d,平面停3d。采用低热水泥,冬季加热,夏季冷却(预冷骨料)。混凝土日浇筑量3200m3,月浇筑量6.7万m3,年最大浇筑量46.6万m3,施工期间,钢板桩围堰曾发生事故,造成了一定损失,但未造成人员伤亡。