冶勒水电站,Yele Hydropower Station
1)Yele Hydropower Station冶勒水电站
1.Construction of deep to overlay for seepage control wall in the Yele Hydropower Station dam;冶勒水电站大坝深厚覆盖层防渗墙施工
2.Removing the surplus part of anti-seepage wall in Yele Hydropower Station;冶勒水电站防渗墙混凝土多余部分的拆除爆破
3.Construction technology of concrete cut-off wall in the gallery of Yele Hydropower Station;冶勒水电站廊道混凝土防渗墙施工技术
英文短句/例句

1.Study on new technology of asphalt concrete core wall in Yele Hydropower Station冶勒水电站沥青混凝土心墙施工新工艺研究
2.The Construction and Quality Control of Concrete Cut-off Wall of Dam at Yele Hydropower Station;冶勒水电站大坝防渗墙施工与质量控制
3.Quality Control for Embankment of Rockfill Dam with Asphalt Concrete Core at Yele Hydropower Station冶勒水电站沥青混凝土心墙堆石坝填筑质量控制
4.Experimental research on asphalt concrete impervious core wall for Yele hydropower station冶勒水电站沥青混凝土心墙防渗性能的试验研究
5.Quality control and management of asphalt concrete core wall in the dam for the Yele Hydropower Station冶勒水电站大坝沥青混凝土心墙质量控制与管理
6.Grouting Construction Technique Study about Yele Hydroelectric Project Diaphragm Wall and Deep and Thick Overburden on Right Bank;冶勒水电站防渗墙及右岩深厚覆盖层灌浆施工技术措施研究
7.The Successful Application on Steel Pipe Chute Tube for Backfill Concrete Pouring in Penstock Which Has Long Inclined Shaft in YeLe Hydropower Station钢管溜筒在冶勒水电站压力管道长斜井回填混凝土浇筑中的成功运用
8.Study On Engineering Geology Properties and Main Problems of Yelei Hydropower Station Dam Foundation Extra-thick Overburden Q_3冶勒水电站坝基超深厚覆盖层Q_3的工程地质特性及主要工程地质问题研究
9.floating power barge水上动力站水上发电站
10.Introduction of metallurgical wastewater advanced treatment project for Shaoguan Smelt Plant韶关冶炼厂废水深度处理站设计及运行
11.The Development for Integrated Automation System of 110kV Substation in Shaoguan Smelting Plant;韶关冶炼厂110KV变电站综合自动化系统的研制
12.hydroelectric(power) statio水(力发)电厂[站]
13.dam-type power station堰堤式发电站,蓄水式水电站
14.Soil Suitability Evaluation Based on BP Neural Network基于BP神经网络的土壤适宜性评价——以溪洛渡水电站嘎勒移民安置区为例
15.dam - diversion type hydroelectric power station坝-引水混合式水电站
16.producibility of hydro electric power station水力发电站最大发电量
17.installation of mechanical and electric equipment of hydroelectric power station水电站机电设备安装
18.The hydro-electric station began generating electricity in 1960.1960年水电站开始发电。
相关短句/例句

the Yele hydropower station冶勒电站
3)Yele Hydroelectric Power Station Rockfill Dam冶勒水电站堆石坝
4)Yele reservolr冶勒水库
5)Yele冶勒
1.Effects of aspect on distribution pattern of Taxus chinensis population in Yele,Sichuan Province:An analysis based on patches information.;坡向对四川冶勒红豆杉种群分布格局的影响——基于斑块信息的分析
2.A Study on Relationship between the Distribution Pattern of Taxus chinensis Population in Yele and the Slope Based on Patches Information;利用斑块信息研究冶勒的红豆杉种群分布格局与坡度的关系
3.The Current Remote Sensing Classification Situation and Protective Strategy of Forest Vegetations in Yele Natural Reserve;冶勒自然保护区森林植被的遥感分类现状及保护对策
6)electrometallurgical wastewater电冶废水
延伸阅读

斯里赛勒姆水电站

斯里赛勒姆水电站

Srisailam Hydropower Station 概  述   斯里赛勒姆水电站位于印度安得拉邦、克里希纳(Krishna)河上。为安得拉邦综合开发克里希纳河水能资源计划的组成部分。浆砌块石和混凝土混合型重力坝,最大坝高143m,水库总库容87.22亿m3,电站装机容量77万kW。工程于1965年开工,1984年竣工。   坝址区两岸地形呈台阶状,大坝靠近背斜轴,岩层被网状的断层和节理切割。河床砂砾覆盖层厚15~22m,覆盖层下为石英岩和页岩互层。两岸由石英岩、页岩和板岩组成,呈浅红或棕红色,为中小结晶组织。岩层产状接近水平,倾向正东,缓倾角5°~8°,坝基的主要地质问题是,在坚硬的大块石英岩中夹有较弱的页岩,岩性不均一;断层、节理、裂隙非常发育,在高程145~154m处有一条宽0.2~0.9m的水平剪切破碎带,151~153m高程有一条连续破碎带。   坝址处集水面积为206242km2,年径流量521.6亿m3,水库有效库容为70.8亿m3,面积为617km2。设计洪水流量38347m3/s。 枢纽布置   主要建筑物包括:主坝、发电隧洞、电厂等。   主坝坝顶长512m,坝体混凝土和砌石填筑方量为195.3万m3。其中,河床溢流坝段长266m,共有12个坝段,坝段宽22.5m,非溢流坝段有10个,长246m。河床溢流坝段装有12扇18.2m×16.8m的弧形闸门,最大泄量为37400m3/s,单宽流量为140m3/s左右。   右岸电站厂房为坝后半地下式电站厂房,厂房内布置7台单机容量为11万kW的发电机组,引水隧洞内径为15m。左岸新增9台11万kW可逆式机组,1999年7月第一台机组投入运用。拟建左、右岸灌溉渠道,各灌溉8万hm2耕地。 其  他   1.工程特点   页岩的C值为0.5621MPa,内摩擦角度为33°,大坝可能沿这一软弱面滑动。为了节省混凝土量,抗剪摩安全系数取2.5,并采取以下措施:①坝轴线在平面上布置成半径为10930m的微拱;②将基础附近的坝体建成整体,到一定高程(河床为160.02m,坝肩处为166.1m)才设收缩缝;③在河床左右两侧坝坡上开挖齿槽,将坝体楔入两侧坝坡岩石中,以利用河床两侧边坡上的侧向抗滑能力;④在下游坝址设15.2m宽、30.5m长的钢筋混凝土板,以保证大坝和基岩的锚固;⑤在7~11坝段下游坝址上设宽6m、深5.5m的齿槽,以利用下游岩体的抗力;⑥由于4~6和12~16号溢流坝段不能用楔形齿槽来增加坝体抗滑阻力,故在上游坝踵增高贴块混凝土,即自高程219.5m以下采用1∶0.5的坡度;同时在坝趾设一宽6.01m,深5.5m的齿槽,以利用下游楔形岩体的抗力。对1~4和16~22非溢流坝段也采了类似的措施。采用以上9种措施后,抗剪摩安全系数达到2.81~3.2。   对坝基的处理,除了固结灌浆,帷幕灌浆和打排水孔外,对表层破碎带开挖到一定深度和宽度,回填混凝土;对深层破碎带,施工中发现大坝第11~15号坝段基岩以下15.2m处有一条倾向下游,倾角6°厚1.5m的剪切破碎带,其抗剪强度很低(C=0.126MPa,φ=18°)通过竖井,下游坝基用3条3.05m×4.0m混凝土塞处理,上游坝基用1条混凝土塞处理。