泄洪消能,flood discharge and energy dissipation
1)flood discharge and energy dissipation泄洪消能
1.Hydraulic design for flood discharge and energy dissipation structures of Zaoshi Hydroproject;皂市水利枢纽泄洪消能建筑物水力设计
2.Summary of research on flood discharge and energy dissipation of high dams in China我国高坝泄洪消能研究的最新进展
英文短句/例句

1.The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;Chardara水电站泄洪消能模型试验研究
2.Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge高坝大流量泄洪消能数值模拟及实验研究
3.Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;低水头大流量厂坝联合泄洪消能流场的研究
4.Discussion on energy dissipation design for hydropower station at high head and large discharge大流量高水头水电站泄洪消能设计的探讨
5.Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程混凝土施工管理
6.Safety management in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程安全管理
7.Control of explosion in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程爆破施工控制
8.Management in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程管理综述
9.Experimental Study on Scheme of Energy Dissipation of Discharge Structures of Laodukou Hydropower Station老渡口水电站泄洪消能方案模型试验研究
10.Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam中小型拱坝表孔大流量泄洪消能建筑物体形研究
11.Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir洞河水库双曲拱坝表孔泄洪消能问题的试验研究
12.Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工
13.Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;高拱坝坝身泄洪与消能建筑物的优化布置
14.Research on Barrage Effect for Level Rotary Internal Energy Dissipation Discharge Tunnel;水平旋流内消能泄洪洞的阻塞效应研究
15.Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel;水平旋流内消能泄洪洞水力特性的数值模拟
16.Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel with Shaft Inlet竖井进流水平旋转内消能泄洪洞的数值模拟
17.The study of the thin-arch-dam layout for flood spillway and the effect of energy dissipation薄拱坝坝身泄洪布置及消能效果的研究
18.The trajectory bucket is improved and optimized for suitable trajectory distance and small scouring.泄洪洞挑流坎挑流消能时,当泄流量较小时,挑距较短。
相关短句/例句

energy dissipation泄洪消能
1.Effects of flaring gate pier on energy dissipation and atomization caused by flow through the flood discharge facility;宽尾墩的泄洪消能效果与雾化影响
2.The energy dissipations during flood discharges were studied experimentally for a large hydropower station in southwestern China.该文结合中国西南地区大型水电站泄洪消能的实际进行物理模型试验,对电站原方案下水垫塘的冲击压强进行了试验分析。
3.During design procedure,the difficulties of energy dissipation,construction diversion,large scale gate and so on were solved,which provide some experience for similar water works.喜河工程规模不大,但技术难度不小,并具有鲜明的工程特点,在设计过程中,通过研究分析,成功解决了泄洪消能、施工导流、大型闸门设计等技术难题,对今后类似工程设计具有指导意义。
3)energy dissipation of sluice during flood disposal泄水闸泄洪消能
4)flood-releasing energy dissipation and anti-scour泄洪消能防冲
5)vortex spillway tunnel旋流消能泄洪洞
6)flood energy dissipation system泄洪消能系统
1.This flood energy dissipation system has remarkably relieved the scouring effect of plunging flow on the d/s river bedrock and met the project s requirements for flood energy dissipatio根据恰甫其海水利枢纽工程的泄洪特点 ,通过水工整体模型试验研究 ,推荐了一种比较符合该工程实际的泄洪消能系统方案。
延伸阅读

得食能消【得食能消】  谓菩萨于诸梵行,精进无怠,而于饮食,不节不恣,是以食已即消,而无停滞之患也。