1)Network planning网络计划
1.The application of network planning technique in construction project management;浅析施工项目管理中网络计划技术的应用
2.The application of network planning in project management;网络计划在项目管理中的应用
3.Impact of time difference on precedence activities in network planning optimization;网络计划优化中机动时间对紧前工序的影响
英文短句/例句
1.Technical specification for engineering network planning工程网络计划技术规程
2.The Improving of the Existing Audit Planning Method --An Application of PERT/CPM in the Audit Planning;现行审计计划方法的优化——网络计划技术在审计计划中的运用分析
3.Network planning optimization for the calculating method of heating engineering quantity;采暖工程量计算方法的网络计划优化
4.Design and Develpoment of NPT CAI courseware;网络计划技术CAI课件的设计与开发
5.General rule for representation on network planning techniquesGB/T13400.2-1992网络计划技术网络图画法的一般规定
6.The Project Network Scheduling Technique Based on Extended Network Graph基于扩展网络图的项目网络计划生成技术
7.Courses Scheme Planning Method Based on Network Programming Techniques;基于网络计划技术的教学计划编排方法
8.The Study and Application of Network-planning Technology in Project-planning Management;网络计划技术在项目计划管理中的研究与应用
9.Production Plan with Network Plan Technology;用网络计划技术优化企业生产计划问题
10.District Committee on Elderly Networking长者社区网络计划地区委员会
11.Terms used in network planning techniquesGB/T13400.1-1992网络计划技术常用术语
12.Steering Committee on Social Networking for the Elderly长者社区网络计划导向委员会
13.Study on the Application of BANT Basic Network and Its Algorithm;BANT基本网络计划及其算法应用研究
14.Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;网络计划工期费用优化及其蚁群算法
15.The Research of the Resource Optimization in Engineering Network;工程网络计划中资源优化问题的研究
16.Study on Risk Element Transfer in Network Planning Project;网络计划类项目风险元传递理论研究
17.Advanced Research Projects Agency Network高级研究计划署网络(阿帕网)
18.Study and Plan on Computer Networking Design of Fuling Chemical Industry Joint-Stock Co., Ltd.;涪陵化工计算机网络规划设计与研究
相关短句/例句
network plan网络计划
1.Application of network plan in bidding work;网络计划技术在投标工作中的应用
2.The application of ahp to network plan evaluation;AHP方法在网络计划评估中的应用
3.A Study on Combined Optimization of the Project Network Plan;项目网络计划综合优化的研究
3)network schedule网络计划
1.Optimization model for resource dispatching in network schedule with consideration of cost of unused resources;考虑资源闲置成本的网络计划资源调度优化模型
2.Construction period optimization of project network schedule;工程网络计划的工期优化
3.Time-cost tradeoff optimization is a subject of much work among network schedule optimization.人们对网络计划费用优化问题的研究主要是基于传统的网络计划技术和数学规划的方法,但是这些方法都存在一些缺陷。
4)network program网络计划
1.Application of network program in the management of production plan for heavy machinery;网络计划在重型机械生产管理中的应用
2.With practical projects,the author discusses the direct optimization method for the limited resource and shortest construction time conditions of a construction network program,and deduces a dynamic optimization method for the limited resource condition and a comprehensive optimization method for resource,construction time and cost.结合实例,探讨了建筑工程施工网络计划资源有限、工期最短的直接优化方法,并由此推导出资源有限的动态优化方法和资源、工期、费用的综合优化方法。
3.Network program is a kind of both science construction plan and most valid construction management method.网络计划是一种科学的施工计划,又是一种最有效的施工管理方法。
5)network project网络计划
1.Application study of multi-goal optimization model in network project;多目标优化模型在工程网络计划中的应用研究
2.Using the engineering project management software Microsoft Project 2000 can optimize network projects,deal with lots of complexly calculative problems,improve engineering project management level.建设工程项目管理是一项十分复杂的活动,施工计划的安排控制等工作比较繁琐,需要经常性调整计划和进行实时动态管理,使用项目管理软件Microsoft Project 2000完成网络计划的优化,解决网络计划应用中大量繁重的计算的实际问题,提高工程管理水平。
3.Based on the study of construction network project, the authors pose a new estimate criterion: construction quality and set up the network s mathematics model.通过对施工网络进度计划的研究 ,提出一种新的评价准则——工程质量 ,并建立了网络计划的数学模型 。
6)plan network计划网络
1.According to the characteristics of interval plan network,this paper introduces the concept of interval critical path(DBICP).论文针对区间数计划网络的特点,提出了基于限制期约束的区间关键路(deadline basedinterval critical path,DBICP)的概念,通过相关定理的证明给出了求解DBICP的算法,该算法拓展了Stefan Chanas和Pawel Zielinski关于区间关键路问题的研究成果。
延伸阅读
矿山建设施工的网络计划技术矿山建设施工的网络计划技术network scheduling technique in mine construction kLJangshon Jians触shigong de wanglLJoJ一hua Jishu矿山建设施工的网络计划技术(n etworksehe一duling teehnique in mine eonstruetion) 根据图论和网络理论,用计算机编制和管理矿山建设施工进度计划的方法。网络计划技术又称统筹法。 简史长期以来,工程建设施工进度计划都用人工编制,以条形图表示。在此基础上,按定额编制劳动力、材料、设备、财务计划。当工程规模较大时,用人工编制工程建设施工进度计划,费力费时,且不够细致准确,而且在情况变化时,还难以修正。 1957年,美国杜邦公司(I.E·dupont de Nermours簇黔麟然蒸 eo.)与兰德公司(Remington Rand,Univae)合作,开发式中(h,i)为工序(i,j)前的全体紧前工序。只有在这些 了关键路径法(c PM一Critical Path Method),用于杜邦紧前工序全部结束后,工序(i,j)才能开始。第一项工 公司所属化工厂的建设。1958年,美国海军军械局为序的最早开始时间等于。,作为初始条件。 了编制北极星导弹研制的进度计划,开发了计划评审(2)工序最早结束时间坛(i,j)必等于 技术,协调3800多家主要承包商的进度及衔接。这两tef(i,j)一tes(i,j)+D(i,j) 种技术在一开始便取得成功,迅速在建设施工和大型(3)在全体工序的最早开始时间和最早结束时间 科技工程中得到推广。以后又出现了很多新方法,其中计算完后,便按后退顺序逐个工序计算工序最迟结束 比较著称的有解决随机问题、强调图形表示的图形评时间tl;(i,j) 审技术,和解决随机问题,不仅考虑工序时间,同时考‘ lf( i,j)一职{‘lf(j,k)一D(j,k)} 虑成本、指标和风险的风险评审技术。式中(j,k)为紧接工序(i,j)后面的全体紧后工序·工 60年代初期,中国华罗庚教授倡导推广统筹法。序(i,j)最迟结束的条件是不能影响总工期。初始条件 由此,网络计划技术逐渐在中国采矿企业工程项目中是最后一项工序的最迟结束时间,等于该工序的最早 得到应用,它主要用于生产接续工程计划、设备大修计结束时间。 划和工程施工计划,更多用于煤矿建设。(4)工序最迟开始时间t。(i,j)必等于 基本原理和方法网络计划技术把工程项目分解tls(i,j)~tlf(t,j)一D(l,j) 为若干工序,用网络图表示工序的进展和衔接。如网络(5)时差及关键路径的判定。如果工序的最早结束 图所示,用箭头表示工序,记为(l,j)(图中i,]一1,5,时间tef(i,j)与最晚结束时间tlf(i,j)不同,说明工序(l, 10,…,100),节点i,j称为事件,箭尾事件i表示工序j)开始或结束时间并不严格,窜动几天不会影响总工 的开始时刻,箭头事件j表示工序的结束时刻·工序的期。允许窜动的天数称为时差。
