工期优化,Time Optimization
1)Time Optimization工期优化
1.A Study on Time Optimization of Alternate Construction Network;搭接施工网络工期优化研究
英文短句/例句

1.Period Optimization Scheme Determination of Building Engineering Construction Network Plan建筑工程施工网络计划工期优化方案的确定
2.“TFE” method--the New Train of Thought of Network Plan Time Limit for a Project Optimization;“TFE”法——网络计划工期优化的新思路
3.THE PROJECT COST-TIME OPTIMIZATION GRAPHICAL METHOD工程计划成本—工期最优化的图示方法
4.A Study on the Method of Time-Resource Optimization of Engineering Projects;工程项目工期——资源优化方法研究
5.Process optimization of third stage project of the Guhengqiao Water Plant in Pinghu City平湖市古横桥水厂三期工程工艺优化
6.Publishing high-quality journals based on optimized relay-type process and detailed division of labor优化流程细化分工 接力打造精品期刊
7.The Optimizing Project of Construction Network in Time-cost Algorithm of Engineering;工程施工网络计划中工期-成本优化方案
8.Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;网络计划工期费用优化及其蚁群算法
9.Dezhou IP Network Improvenment Project Implementation Plan;德州IP城域网二期优化工程实施方案
10.Right-Moving Distance Method for Project with Resource Leveling and Fixed Completion Time;“工期固定,资源均衡”优化的后移差法
11.Improvement of the moral education in higher school library;论新时期高校图书馆德育工作的优化
12.A Mixed Integer Programming Model for Optimizing Project Time Limit and Cost;工期-成本优化的混合整数规划模型
13.The Study of Initiative TD-SCDMA Network OptimizationTD-SCDMA无线网络工程初期优化的研究
14.Optimization of Treatment Process of Algae-laden Raw Water from Luan River高藻期引滦原水处理工艺的优化研究
15.IMPROVEMENT OF OPTIMISTIC METHODS FOR RESOURCE LEVELING WITHIN FIXED COMPLETION TIME工期固定——资源均衡优化方法的改进
16.Low analysis about the application of LINGO in the optimization of the rources and the time limit for project浅析LINGO软件在工期资源优化中的应用
17.The Optimization of Winter Construction of Building Engineering in Shen Yang City;沈阳市建筑工程冬期施工方法优化研究
18.Time-Cost Trade-Off of Construction Project based on Ant Colony Algorithm;基于蚁群算法的施工项目工期-成本优化
相关短句/例句

Optimization of construction time施工工期优化
3)time-resources tradeoff工期资源优化
1.the activity criticality index(ACI) and cruciality index(CRI) and adoption of 0??1 integer programming algorithm,a resource reallocation model and a calculating method were established for time-resources tradeoffs of PERT resource-constrained scheduling.针对资源限制下PERT施工进度计划的工期资源优化问题,引进评价风险量的关键指标———活动关键度指标(ACI)和重要度指标(CRI),采用0-1整数规划技术,建立资源配置优化模型以及优化计算方法;运用Delphi7。
4)time-cost trade-off工期-成本优化
1.Using ant colony algorithm to solve construction time-cost trade-off problem;施工项目工期-成本优化问题的蚁群算法
5)time-cost optimization工期-费用优化
1.The time-cost optimization is the core of network plan.工期-费用优化是网络优化技术的核心内容。
2.The paper applies ant colony algorithm to network planning time-cost optimization problems,thereby getting a accurate,comprehensive and efficient solution optimization method.文章将蚁群算法应用于计划调度的工期-费用优化问题之中,得到一种精确、全面,求解效率高的优化方法。
6)time-cost optimization工期费用优化
1.Time-cost optimization is considered as a highly important content to the scheduling of the project management.工期费用优化是工程项目管理中进度控制的一项重要的内容,在工程项目的建设中,合理地安排各活动的进度,能给项目带来明显的经济效益。
延伸阅读

建设工期  建设项目或单项工程在建设过程中耗用的时间。即从设计文件所列工程正式破土动工到建成投产(生产出设计规定的合格产品)或交付使用为止所需要的时间,包括建筑、安装、试车、验收、交付使用等所需要的时间,但不包括施工准备时间。一般按日历工月数计算,并明确建设起止年限。    建设工期是具体安排计划、签订经济合同、组织施工、检查工程进度的依据,也是从建设速度的角度反映和考核投资效果的指标。缩短建设工期,尽快形成生产能力,既能减少基本建设投资的占用,节约投资支出,又能为增加额外社会产品和国民收入创造物质技术条件,并使企业能比计划或工期定额规定的时间提前而获得更多的盈利。拖延工期,必然导致大量人力、物力、财力陷入未完工程中,长期不能发挥其经济效益,造成不应有的损失。中国第一个五年计划时期,基本建设工作组织得比较好, 156项骨干项目的建设工期,一般只用三四年时间。以后建设工期逐渐拖长,有的项目建设工期甚至拖长一倍以上。为了加快社会主义现代化建设,必须努力缩短建设工期。国家要求,除了少数工程量特大的项目以外,一般的项目建设工期要缩短到五年以内,大中型纺织厂、轻工厂、机械厂要在二三年内建成。国家责成各部门、各地区,根据本行业、本地区的具体情况,按平均先进水平,分门别类订出同类型、同规模建设项目的工期定额,作为确定具体建设项目工期的依据。大中型项目要按合理工期一次安排建设计划,分配投资和材料,落实建设条件和相关项目的同步建设,分年实施,以保证工程开工后能连续建设,按期建成,并形成综合生产能力,以提高投资效益。建立健全工期责任制,工程按期或提前投产,给予一定的奖励;由于工作上的原因拖长工期,给予经济惩罚。    就组成单项工程的某一个单位工程(如厂房建设或设备安装)的施工而言,则自该单位工程正式动工至完成的时间,在中国称之为施工工期。