技措项目,Technical innovation project
1)Technical innovation project技措项目
2)measure program措施项目
1.With the Code of Valuation with Bill Quantity of Construction Works as the guide,the paper first overly analyzes the content of the detailed measure program,the establishment of criterion,the valuation principle and the valuation method,and then suggests some quote skills for the cost of measure program.工程量清单计价是当前国际上普遍采用的工程计价形式,本文结合《建设工程工程量清单计价规范》的实施,对措施项目清单的内容、编制依据、报价原则以及计价进行了总体分析,提出了措施项目费的报价方法。
英文短句/例句

1.Application of Unbalanced Bidding in Supporting Item不平衡报价在措施项目报价中的应用
2.Research of Bidding for Overall Items under Code of Valuation with Bill Quantity of Construction Projects;建筑工程工程量清单计价措施项目报价研究
3.Investment Strategies of Private Enterprises in Developing Infrastructure Projects;民营企业发展基础设施项目投资措施
4.4 Projects for reducing coal as fuel and measures for rationed use of coal四、压缩燃煤项目及合理利用煤炭措施
5.On the inner cost control and steps of road bridge program;浅谈路桥项目部内部成本控制及措施
6.Risks of PPP Financing Projects and Measures of Avoiding Risks by Contract;PPP融资项目风险及其合同规避措施
7.The research of control measure in whole process of hydrotechnice funds;对水利项目资金全程控制措施的研究
8.Financial Analysis of Environmental Protection Measures in Environmental Impact Assessment建设项目环境保护措施经济论证浅析
9.Discussion on Vegetation Restoration Measures of Linetype Development Project浅议线型开发建设项目植被恢复措施
10.Risk evaluation and prevention measures of construction projects建筑工程项目的风险分析与防范措施
11.Analysis on Construction Project Cost Control Measures建筑工程项目成本控制措施分析探讨
12.Implementation Study of Guanghe Project Internal Control Measures of Xi an Road and Bridge Company;路桥西安公司广贺项目内控措施的实施研究
13.The Discussion of Highway Bridge Project Construction Item Cost Control Measure;路桥工程施工项目成本控制措施分析探讨
14.Emergency and Countermeasures of Actualizing the Practice of "Physical Education and Art (2+1) Program";论实施“体育、艺术2+1项目”的紧迫性与措施
15.Study on the Improvement Alternative of QPM Corresponsive Contermeasures for Firm AA公司项目质量管理升级方案与实施措施研究
16.Government incentives for private sector involvement in infrastructure PPP projects激励私营部门参与基础设施PPP项目的措施
17.Study on construction project cost control measures of building engineering建筑工程施工项目成本控制的措施研究
18.The new NPA includes 18 major goals, 55 supportive indicators and 66 strategic measures.整个纲要共有18项主要目标,55项支持性目标和66项策略措施。
相关短句/例句

measure program措施项目
1.With the Code of Valuation with Bill Quantity of Construction Works as the guide,the paper first overly analyzes the content of the detailed measure program,the establishment of criterion,the valuation principle and the valuation method,and then suggests some quote skills for the cost of measure program.工程量清单计价是当前国际上普遍采用的工程计价形式,本文结合《建设工程工程量清单计价规范》的实施,对措施项目清单的内容、编制依据、报价原则以及计价进行了总体分析,提出了措施项目费的报价方法。
3)step item cost措施项目费
1.The analysis and research for compete force of step item cost in bid quoted price to bill quantity of construction;工程量清单投标报价中措施项目费竞争力分析研究
2.The step item cost,one of three important parts in the bill quantities of construction,was fully analyzed in this paper and its importance was specifically stressed in the building construction.通过具体事例说明管理好工程量清单中措施项目费的重要性。
4)project technology项目技术
5)sports events竞技项目
1.On tacit knowledge in sports events and its revealment;论竞技项目中的隐性知识及其显现化
6)technical item技术项目
1.Therefore there are so many technical items in its product standards to evaluate and control its quality and performances.制动液的质量和性能直接影响汽车的行车安全,在其技术标准中有许多技术项目以评价其性能优劣。
2.It analyzes the problems of evaluation of industrialization technical item of our country,builds and consummates the index system,which based on market orientation and converging technique,society benefit,law estate,economic benefit,risk factors and so on; and quantifies index system; on the base of the index system s dimension go back to one,it builds up the integrated evaluation model.在分析我国产业化技术项目评价存在的问题的基础上,建立和完善了基于市场为导向的集技术本身、社会效益、法律状态、经济效益、风险等集成的产业化技术项目评价指标体系;并对各指标进行量化测定;在实现各指标量纲归一的基础上,建立了产业化技术项目综合评价模型。
延伸阅读

不合格品纠正措施(见纠正措施)不合格品纠正措施(见纠正措施)corrective actions for nonconforming product:see corrective actions bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。