验收试验,acceptance test
1)acceptance test验收试验
1.Turbine model and model acceptance test for Longtan Hydropower Station;龙滩水电站水轮机模型及验收试验
2.The rationality and necessity of specification for safety factor,acceptance test and qualification of anchor in the ground anchorage standards of China,America,British and Japan are discussed.描述了中国、美国、英国、日本等国的岩土锚杆标准中关于锚杆设计安全系数、验收试验及锚杆合格条件规定的合理性和必要性。
3.The conclusion of the acceptance test is that both the behaviors of the model t.为了验证瀑布沟水电站水轮机模型的水力性能,进行了模型验收试验
英文短句/例句

1.acceptance test验收试验;验收试验;接机考验;接收测试;接收试验
2.Light weight gas turbines acceptance test specificationGB/T10490-1989轻型燃汽轮机验收试验规范
3.Code for model acceptance tests of hydraulic turbinesGB/T15613-1995水轮机模型验收试验规程
4.Bayesian scheme of acceptance test in exponential case指数型产品可靠性验收试验方案研究
5.Discussion of Slapper Detonator’s Acceptance Test Criteria冲击片雷管鉴定验收试验规范的探讨
6.The Turbine Model Acceptance and Local Test of Longtoushi Hydropower Station龙头石电站水轮机模型验收试验与现场测试
7.Rules for power plant steam turbine thermal acceptance testsGB/T8117-1987电站汽轮机热力性能验收试验规程
8.Determination of mechanical vibrations of gear units during acceptance testingGB/T8543-1987验收试验中齿轮装置机械振动的测定
9.Analysis of the Acceptance Test Results of 9 Capacitive CTs9台电容式电流互感器验收试验结果的分析
10.Acceptance test on model for Kaplan turbine in Xixiayuan Project西霞院工程轴流转桨式水轮机模型验收试验
11.acceptance functional test验收功能试验;验收功能试验;验收性能试验;验收性能试验
12.fabric shrinkage test织物收缩率试验,织物缩水试验
13.conglutinative complement absorption共凝集补体吸收(试验)
14.AGREE (Advanced Ground Receiving Equipment Experiment)高级地面接收设备试验
15.testing method for shrinkage of spun yarn精纺纱的收缩率试验法
16.Specification for acceptance test of water-cooling tower冷却塔验收测试规程
17.Electronic Road Pricing Pilot Study电子道路收费试验研究
18."Erection, Test Runs, Commissioning, Performance Test and Acceptance"安装、试车、投料试生产、性能测试和验收
相关短句/例句

Test & Acceptane试验及验收
3)acceptance test(ing)验收试验;接收试验;验收;收料试验
4)performance test验收测试
1.Problem discussion of performance test of CEMS in coal-fired power plant;燃煤电厂烟气排放连续监测系统验收测试问题探讨
2.Correlative regulations of International Standard ISO and USA EPA about performance test of CEMS are illustrated simply.简述了ISO标准和美国EPA关于烟气排放连续监测系统验收测试的相关规定,并详细介绍了我国燃煤电厂烟气排放连续监测系统验收测试方法。
5)Recovery test回收试验
1.Methods Recovery tests were done in mixed serum samples with standard substance of different consistency.目的 观察回收试验中加入不同浓度标准物对回收率的影响。
6)acceptance testing验收测试
1.This paper is mainly discussing the merits, defects and applicable case of unit testing, integration testing and acceptance testing during software development.本文着重讨论了在SDLC过程中单元测试、集成测试以及验收测试的优缺点和适用情况。
延伸阅读

承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条