验算,checking calculation
1)checking calculation验算
1.Stress checking calculation of steam-water pipes in thermal power plants and its application;火力发电厂汽水管道应力验算与应用
2.The program can complete checking calculation of the gear cutters, as well as the design of the dedicated gear cutter.以 Office套件中的 Excel作为设计平台 ,编制了内齿轮插齿刀的设计计算程序 ,它可一次性完成现有插齿刀的验算及专用插齿刀的设计。
英文短句/例句

1.Multiplication can be proved by division.乘法可用除法来验算
2.It is useful to have checks against arithmetical errors.为防止算术计算中的错误,加以验算是有益的。
3.checking program [ route ](计算机)校验程序
4.We are going to have a test on June .我们打算在六月做试验。
5.nondedicated laboratory computer非专用实验室计算机
6.give the pupils a test in arithmetic对小学生进行算术测验
7.Atlas Computer Laboratory阿特拉斯计算机实验室
8.Experiments in Computer Organization计算机系统结构实验
9.clinical laboratory computer system临床实验室计算机系统
10.computer-controlled satellite test statio计算机控制卫星试验站
11.central laboratory minicomputer中央实验小型计算机
12.main laboratory minicomputer实验室用主小型计算机
13.computerized adaptive testing计算机化适应性测验
14.operating characteristics of test of mean均值检验的运算特性
15.modular laboratory computer模块化实验室计算机
16.Have experience in the computerization of financial functions.有财务电算化的经验。
17.The scientist plans experiments, performs calculations, and makes observations to test hypotheses.科学家计划实验、计算、观测以检验假定。
18.The experiment verifys the validity of algorithm.仿真试验验证了该算法的有效性。
相关短句/例句

checking[英][t?ek][美][t??k]验算
1.Stability analysis and checking for landslides and sediments of Heping Square s slide areas in Wanzhou District;万州和平广场滑坡区滑坡及堆积体稳定性分析与验算
2.Through the construction and the checking in the actual project,the reference for the foundation pit slope support in the high-rise building application was given.通过实际工程的施工及验算,为基坑支护在高层建筑中的应用提供了参考。
3.Through checking,the results of fastener connection anti-sliding and load eccentricity can meet the security requirement.结合工程实际,选用参照规范,计算了钢管脚手架的最大搭设高度、稳定性以及立杆底座和地基承载力,并对其进行验算,扣件连接抗滑移和荷载偏心等均满足安全要求。
3)checking computation验算
1.The checking computation of structural size of gold dredge in mining of gold placer;砂金矿采金船开采结构尺寸验算
2.The analysis of concrete pillar fixture checking computation;混凝土柱吊装的一种验算方法
3.This article describes the detailed process of checking computation case of V-type frame in the interchange at the Stake No.800立交桥V型刚架结构内力的详细复核计算分析过程,其中包括确定其承载能力、验算分析其结构尺寸及使用安全性,确保桥梁今后的安全运营,可为同类型桥梁设计提供参考数据及经验。
4)checking computations验算
1.In this article, the measure of the temperature controlled checking computations of the steel-making s soleplate huge-cubage concrete is introduced.本文介绍了炼钢转炉底板大体积混凝土的温度控制的验算方法。
2.This text tests a section of 15 section project instances through one military airport in the South, subside and calculate checking computations with the consolidation method to the ground, carry on the fetching value rationally to the experience parameter of this area.通过南方某军用机场试验段15个断面工程实例,对地基沉降与固结方法计算进行验算,对该地区的经验参数进行合理取值。
3.It indicates necessity of framework checking computations.通过无粘结预应力现浇板的设计,总结出设计计算的步骤方法,表明结构验算的必要性。
5)check[英][t?ek][美][t??k]验算
1.The article introduces the design scheme of chevron composite triangular stabilized struc- tural non-weighting form traveler,and focus the introduction on the characteristics of the form trav- eler and the checking process of the key components of this form traveler able to be referred for the construction of the similar bridges.该文介绍了人字式组合三角形稳定结构无压重挂篮的设计方案,其中着重介绍了挂篮的特点及该形式挂篮关键构件的验算过程,为进行类似桥梁施工提供一定的参考。
2.The paper presents how to check starting time and motor s power.本文给出了启动时间和电机功率的验算方法。
3.It discusses substitution of steel bar in steel bar & concrete parts by calculation,puts forward noteworthy points,and points out that design principles & regulations should be obeyed and normal using functions sho uld be checked further after substitution.通过计算论述了钢筋混凝土结构中钢筋代换问题,并提出了代换中的注意点,指出代换应遵循设计原则和规范,代换后的正常使用性能需要进一步验算
6)calculation[英][,k?lkju'le??n][美]['k?lkj?'le??n]验算
1.,it researches on the bridge calculation means,analyzes on the safety of bridge structure,and puts forward the conclusion of bridge calculation and reinforcement proposals,finally develops safe passage measures,so as to ensure the safety of passenger transportation.结合深圳宝昌电力有限公司运输超重发电机的实际情况,研究了桥梁验算的方法,对桥梁结构的安全进行了分析,得出桥梁验算的结论,提出了加固建议,制定了安全通行的措施,以确保运营安全。
2.According to analysis on reinforcement causes of the construction temporary bridge of the Hongqi Bridge on Chang-Yuan line,it discusses reinforcement thought of the temporary bridge,provides concrete reinforcement scheme,and checks the temporary bridge reinforcement,results prove that calculation method and reinforcement adopted is reasonable and feasible.通过对长原线红旗大桥施工便桥的加固原因进行分析,探讨了便桥的加固思路,提出了具体加固方案,并对便桥加固作了验算,结果表明:所采取的计算方法和加固方案是合理可行的。
3.Combined with the features of arch bridge,it makes a research of bridge supporting frame setting plan,discusses the force on arch section,vertical force calculation of each arch section to the supporting frame,the thrust face calculation at supporting pier and supporting frame calculation,and gets the rational horizontal and vertical supporting wood size.结合拱桥的特点,对桥梁的支架搭设方案进行了研究,就拱段受力情况、各拱段对支架的竖向作用力计算及支墩处受力面的计算与支架验算作了探讨,得出了合理的横纵向楞木尺寸,实践证明了该支架设计方案的合理性。
延伸阅读

验算1.检查运算的结果有无差错。