小湾拱坝,Xiaowan arch dam
1)Xiaowan arch dam小湾拱坝
1.Application of submodel method to inducement slot and check-up porch of Xiaowan Arch Dam;子模型法在小湾拱坝结构诱导缝及检查廊道中的应用
2.Simulative research on temperature field and thermal stress for Xiaowan Arch Dam;小湾拱坝温度场及温度应力全过程仿真研究
3.Analog computation of crack director of Xiaowan arch dam;小湾拱坝诱导缝模拟计算
英文短句/例句

1.Dynamic tracking simulation analysis of temperature field of Xiaowan Arch Dam during construction period小湾拱坝施工期温度场动态跟踪仿真
2.Effects of seismic residual deformation of abutment rock on safety of Xiaowan arch dam坝肩岩体地震残余变形对小湾拱坝安全度影响
3.Research on Xiaowan Arch Dam s Abutment Stability and Reinforcing Treatment Measures;小湾拱坝坝肩稳定及加固处理措施研究
4.Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam小湾拱坝坝基开挖卸荷松弛效应的有限元分析
5.Comparison of Second Stage Artificial Cooling Schemes in Xiaowan Arch Dam小湾拱坝二期冷却方案温控措施对比分析
6.3D finite element analysis of prestressed pier of amptying bottom outlets in Xiaowan arch dam小湾拱坝放空底孔预应力闸墩三维有限元分析
7.Study on Dam Stress Determination Based on Adaptive FEM and Plane FEM Stability Analysis for Xiaowan;自适应有限元大坝应力取值研究及小湾拱坝平面稳定分析
8.Experimental study of strain rate effect on dynamic flexural-tensile properties of wet sieving concrete in Xiaowan arch dam小湾拱坝湿筛混凝土动态弯拉应变率效应试验研究
9.Experimental study on dynamic flexural-tensile mechanical behavior of three-graded concrete in Xiaowan Arch Dam小湾拱坝三级配混凝土动态弯拉力学特性试验研究
10.The Investigate of Measurement Method in Berm After Double-curvature Arch Dam of XiaoWan小湾双曲拱坝坝后马道测量方法探讨
11.Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station小湾水电站双曲拱坝混凝土性能研究
12.Operation and Management of Cable Cranes in the Construction of Xiaowan Arch Dam小湾水电站拱坝施工中缆机的运行管理与探索
13.The Planning,Design and Management of Sand-rock System for the Dam of Xiaowan Hydraulic Power Station小湾电站拱坝砂石系统的规划、设计与管理
14.Flow Surface Construction at the Bottom in No.2 Diversion Tunnel of Double Arch Dam of Xiaowan Hydropower Station小湾双曲拱坝2号导流底孔底板过流面施工
15.The Research on Xiao Wan High Arch Dam s Abutment Stability and Complex Geological Flaw s Generalized Simulation;小湾高拱坝坝肩稳定分析及复杂地质缺陷概化模拟研究
16.Safety monitoring of the construction of high cable foundation of arch bridge on Xiaowan left bank小湾水电站高缆基础拱桥施工安全监测
17.RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
18.Study on Shear Strength of the Interfact between the Xiaowan Arch Dam Body Concrete and the Foundation Rock小湾坝体混凝土与基岩接触面抗剪强度研究
相关短句/例句

Xiaowan high arch dam小湾高拱坝
1.The FEM is adopted to study the effect of upstream bottom-joint on stress conditions of Xiaowan high arch dam.应用三维有限元方法对小湾高拱坝设上游底缝的影响规律进行了初探,分析了无缝和有缝以及干缝与湿缝对拱坝应力和变位的影响规律。
3)Xiaowan arch dam小湾高拱坝
1.The results show that the dynamic stability of Xiaowan arch dam satisfies the design requirement so long as proper anti-seismic measures are taken for the dam shoulders at high elevation.结果表明 ,小湾高拱坝坝肩动力稳定性可以满足设计要求 ,但应注意加强高高程的抗震措
4)Xiaowan dam Shoulder小湾坝肩槽
5)medium and small-size arch dam中小型拱坝
6)Wanba湾坝
1.Number Investigation of Giant Panda(Ailuropoda melanoleuca) in Wanba Township and Comparison of Methods;贡嘎山湾坝乡大熊猫的数量调查及方法比较
延伸阅读

坝湾布依风情坝湾布依风情位于六枝25公里处落别乡,是典型的布依族聚居地,方圆10余里,遍布数个大小瀑布,风光秀丽,气候宜人。每年农历“六月初六”布依族同胞聚集在一起过“郎节山”节日,富有浓郁的乡土气息和民族特色。