TBM施工,TBM construction
1)TBM constructionTBM施工
1.Application of BEAM method prediction of geologic condition system in TBM construction;BEAM法地质预报系统在中国TBM施工中应用
2.Necessity of mid-adits on TBM construction section for super-long tunnel;超长隧洞TBM施工段设置中间施工支洞的必要性
3.Significance of rock debris observation to TBM construction in hard rock;岩碴观测对硬岩TBM施工的指导意义
英文短句/例句

1.Design and Implement of Bi-shield TBM Construction Ventilation System双护盾TBM施工通风系统的设计和实施
2.Primary Exploration on Control of TBM Segment Displacement under Construction in the TunnelTBM施工中管片接缝错台控制措施初探
3.Research on Simulation and Optimization to TBM Construction Processes for Long Complex Tunnels;复杂长隧洞TBM施工过程仿真优化研究
4.Study of Advance Geological Prediction in Tunnel Constructed by TBM;TBM施工隧洞中超前地质预报研究
5.Study on Ventilation and Heat Elimination in TBM Construction;TBM施工中的通风和散热问题研究
6.Numerical Simulation of TBM Construction Ventilation in Long Diversion Tunnel;长距离引水隧洞TBM施工通风数值模拟
7.Research of Groundwater Prediction Technology Fitting for TBM Construction适合于TBM施工的地下水预报技术研究
8.Ventilation Technology of Long Tunnel by Using TBM Construction in Zhongtianshan Tunnel中天山特长隧道TBM施工通风技术
9.Comparative Analysis of Spoil Discharging Modes for Open Type TBM Construction敞开式TBM施工出渣方式对比分析
10.The Influence of High Geo-stress Rock Burst on TBM Construction and its Countermeasures高地应力岩爆对TBM施工的影响及对策
11.Adverse Geological Conditions' Effect and Analysis on Tunnel Boring Machine Construction不良地质条件对TBM施工的影响与探讨
12.MONITORING OF TUNNEL CLEARANCE DISPLACEMENTS UNDER CONDITION OF TBM CONSTRUCTIONTBM施工条件下隧道净空位移监测
13.Preliminary Study on TBM in the Tunnel Project of the Water Diversion Project from Hongyan to Stone River引红济石输水隧洞工程TBM施工适应性初探
14.Discussion on Main Geological Disasters as Well as Relevant Survey in Construction with TBMTBM施工中主要地质灾害及相关勘察工作的认识
15.The Research of Rock Resistance to Abrasion in Guanjiao Tunnel Based on the TBM Construction;基于TBM施工的关角隧道岩石耐磨性研究
16.Labor optimization in TBM construction of Qinling extra-long tunnel on Xi an-Ankang railway;西安安康铁路秦岭特长隧道TBM施工劳动力优化
17.Research of Internal Force Models of Lining Segment of TBM TunnelTBM施工隧洞衬砌管片内力分析模型研究
18.Risk Analysis Theory of Diversion Tunnel TBM Construction and Its Application引水隧洞TBM施工风险分析理论方法与应用
相关短句/例句

TBM constructionTBM 施工
1.According to practical experiences,some construction countermeasures are discussed for TBM constructions in bad.埋深大、线路长的隧洞采用 TBM 施工,已成为国际上快速开挖隧洞的主流。
3)TBM construction tunnelTBM施工隧道
1.The main seepage of assembly pipe in the TBM construction tunnel happens at the joint of pipes,and the water-expansion rubber is the main waterproof material for the assembly pipe joint in the TBM construction tunnel.TBM施工隧道装配式管片渗漏水的位置主要是管片的接缝,遇水膨胀橡胶是TBM施工隧道装配式管片接缝所用的主要防水材料。
4)tunneling with TBM隧洞TBM施工
1.Study on simulation and optimization of tunneling with TBM for long tunnel;长隧洞TBM施工全过程仿真优化研究
5)TBM construction surveyTBM施工测量
1.Taking Qinling Tunnel as an example and on the premise of survey design,the technical points, concrete requirements and items for attention of horixontal control survey in extra-long tunnel are expounded in this paper Meanwhile,operating principle as well as the usage of IED-260 tunnel guiding system which adapting to TBM construction survey technique are also briefly introduced.以秦岭隧道工程为例 ,以测量设计为前提 ,全面论述了特长隧道洞内平面控制测量的技术要点、施测过程中的具体要求及注意事项 ,同时 ,对适应TBM施工测量技术的IED - 2 6 0隧道导向系统的工作原理及使用方法作了简要介
6)tunnel excavation by TBMTBM隧道施工
延伸阅读

施工企业技术组织措施计划(见施工企业技术)施工企业技术组织措施计划(见施工企业技术)technical and organize measurement plan in construction enterprise 施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。