高炉鼓风机,blast furnace blower
1)blast furnace blower高炉鼓风机
1.Connecting with the instance,this paper expounds the design scheme of technological control process for transfer air system of the blast furnace blower,which can supply the reference for the design of other transfer air system.结合实例,详细阐述了高炉鼓风机拨风系统工艺控制流程的设计方案,为高炉冷风拨风系统的设计提供了参考。
2.Through analysis of causes of surge and counter flow incidents of a blast furnace blower,the disposal measures to improve the control system were raised.通过对一起高炉鼓风机喘振、逆流事故的原因分析,提出了完善改进控制系统的处理措施,增强了高炉鼓风机安全稳定运行的可靠性,有效地避免了类似事故的发生。
3.It is difficult to guarantee the alignment precision during a coupling aligning of blast furnace blower due to axial moving of a rotating shaft.针对高炉鼓风机联轴器找正时,由于转轴的轴向串动,导致找正精度难于保证的问题进行研究,提出了不同转速、不同端面直径的联轴器找正的经验值,介绍了通过采用同步旋转法、三表法消除由于联轴器制造质量误差、轴向串动对测量值的影响,可以大大提高找正精度,保证设备安全运行。
英文短句/例句

1.An unit with Blast furnace Blower having a Common Axis Run and Analysis of it's Energy Saving高炉鼓风机同轴机组运行与节能分析
2.Using Excell to Select Blower Model of Blast Furnace用Excel完成高炉鼓风机选型的计算
3.The PLC Control of AV45-12 Axial BlowerAV45-12型轴流式高炉鼓风机的PLC控制
4.The Redundancy Control of AV45-12 Axial BlowerAV45-12型轴流式高炉鼓风机的冗余控制
5.Design and Application about DCS in the AV56 Blast Furnace Fan of LAIWU Iron&Steel Co. Ltd;莱钢AV56高炉鼓风机控制系统的设计与应用
6.Revamp of low pressure heater of flow blower for NO.1 Blast Furnace of WISCO武钢1号高炉鼓风机组低压加热器的改造
7.Reconstruction of Low Pressure Heater of Flow Blower of Wugang No.1 Blast Furnace武钢1号高炉鼓风机组低压加热器改造
8.Optimization and applications of the AC800F system in blast furnace blower controlAC800F系统在高炉鼓风机控制中的优化应用
9.Abstract: The designing function and method of computer monitoring and control system for BF blower are discussed in this paper.本文介绍了一种应用于高炉鼓风机的计算机监控系统的功能及软硬件设计方法。
10.This article gives a brief account of the calculating program for blast furnace blower's model,the program's function and application.本文简述了实际工作中编写的高炉鼓风机选型计算程序及其完成的功能和使用方法。
11.blast-furnace cinder高炉矿渣, 鼓风炉炉渣
12.Research and Application of Four-oil Wedge Bush in Electric Blower of Blast Furnace四油楔轴瓦在高炉电动鼓风机上的研究与应用
13.The hot air is always carried to the furnace by a powerful turboblower, through the hot blast main, bustle pipe, bootleg, blowpipe and tuyere.热风由功率强大的鼓风机通过热风总管、环形风管、风口小弯管、直吹管和风口不断鼓人高炉。
14.Technology Transformation of Energy Saving by Variable Frequency Speed Control of Blast and Induced Draft Fans in Hot Water Boiler;热水锅炉鼓引风机变频节能技术改造
15.Modern forges have mechanically powered Bellows or rotary Blowers现代锻铁炉用机械动力风箱或旋转式鼓风机。
16.auxiliary blower辅鼓风机应急鼓风机
17.Comprehensive control system of gas pressure in coke oven collector and blower焦炉集气管压力与鼓风机综合控制系统
18.Iron is extracted from the ore by means of the blast furnace.铁是从铁矿中通过高炉鼓风煅烧炼取的。
相关短句/例句

blast furnace steam blower高炉蒸气鼓风机
3)blast furnace blowing高炉鼓风
4)blast furnace鼓风炉,高炉
5)drive system of blast furnace blower高炉鼓风机拖动系统
6)boiler blower锅炉鼓风机
延伸阅读

高炉鼓风动能高炉鼓风动能blast momentum gao{u gufeng dongneng高炉鼓风动能(blast momentum)高炉的每个风口前端单位时间内鼓入的风量所具有的动能,以kg·m/s或N·m/s为单位。计算公式为 。工,叼望、厂.玉立-丝全匕迪鱼]2 E一份,(~)}一-气下-不二吮六廿二,一} 一2、gn Ln兀/4d污273P」式中Q。为标准状态下每秒进入风口的风量,m“/s;p为标准状态下鼓风的密度,无富氧时可取1·293kg/m3;g为重力加速度,9·81m/52;d。为风口直径,m;t风为热风温度,℃;p。为一个标准大气压的折算压强,1.01只105N/mZ;p为热风的绝对压强,N/mZ,直接由风压仪表取得的读数为表压(P表),且工程上多用单位为kg/c mZ,按下式折算为绝对压强:p一(P表x9.81只10‘十1.01只1护)N/m“。上式是在纯焦炭冶炼,即不喷吹辅助燃料条件下的计算公式,否则由于随辅助燃料有作为输送介质的不同成分的气体入炉,情况要复杂得多。由上式可见。影响鼓风动能的因素有:(1)实际入炉风量。因E正比于Q弓,故对动能的影响程度最大。(2)风温。风温升高的结果,由于受热膨胀,鼓风的实际体积,即其流速将增大两倍左右。(3)风压及风口直径。此二者的值越大,则在同样的风量及风温条件下实际风速降低,从而动能下降。一般情况下,高炉的送风量及风压是由冶炼的操作状况决定的,故调节鼓风动能的实用手段是调节风口直径。若已知在风口直径为dl时,鼓风动能值为El,在风量及风温不变条件下,欲将动能值调节为E:,则相应的风口直径d:由下式决定: “2一dl梧 当高炉喷吹燃料时,不管此燃料为固态(如煤粉)、液态(油类)或气态,由安装在直吹管上的吹入口至风口前端的短距离内,皆会不同程度地发生热分解,甚至部分燃烧。此时经由风口鼓入炉内的已不是单纯的热风,而是热风与燃料及输送介质以及燃料部分分解或燃烧产物的混合物。此时鼓风动能的计算应考虑此混合物与单纯热风在数量、温度、密度和压力等方面的变化所产生的对动能值的影响。由于喷吹辅助燃料等的情况千差万别,包括燃料的种类、数量,输送载体的性质、数量、温度及压力以及在直吹管内燃料的热分解和预先部分燃烧的状况等,尚不能给出此复杂多变条件下的鼓风动能的计算通式,需要具体情况具体处理。由于风量是鼓风动能计算中的关键参数,按鼓风机房或热风围管处检测的计示风量进行计算,由于送风系统的泄漏及计量误差,往往得不到可靠的结果。正确的方法是参照炉顶煤气成分并按全炉碳平衡法计算风口前实际燃烧的碳量,再折算出实际风量。 鼓风动能决定了鼓风沿风口轴线向炉中心穿透的深度,从而影响风口回旋区及燃烧带的形状和尺寸。不同的高炉有各自适宜的鼓风动能值的范围,并往往取为炉缸直径的函数。(见燃烧带) (齐宝铭)